Quarterly report pursuant to Section 13 or 15(d)

INSURANCE RECEIVABLE

v2.4.0.6
INSURANCE RECEIVABLE
9 Months Ended
Sep. 30, 2012
INSURANCE RECEIVABLE

NOTE 3 – INSURANCE RECEIVABLE

During the fourth quarter of 2011, the graving dock at our Texas facility flooded unexpectedly when soil washed out from under the graving dock floor, which allowed water from the Gulf Intracoastal Waterway to enter the dock through the floor and caused damage to a portion of the graving dock slab. To prevent further flooding, we designed and constructed a coffer cell to drain the dock and complete repairs to the slab so that it can be utilized during the fabrication stage of the Williams Gulfstar FPS GS-1 hull project. The graving dock has been drained and we have commenced the necessary repairs. The current estimated cost to repair the graving dock slab is $7.5 million, all of which will be covered by insurance. We expect to collect all amounts associated with the slab repair in the fourth quarter of 2012. As of September 30, 2012, we have recorded $2.7 million in prepaid expenses and other current assets on the consolidated balance sheet for recoverable repair expenses under this claim, net of related deductibles.