UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM
(Mark One)
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the fiscal year ended
OR
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 FOR THE TRANSITION PERIOD FROM TO |
Commission File Number
(Exact name of Registrant as specified in its Charter)
(State or other jurisdiction of incorporation or organization) |
(I.R.S. Employer Identification No.) |
(Address of principal executive offices) |
(Zip Code) |
Registrant’s telephone number, including area code: (
Securities registered pursuant to Section 12(b) of the Act:
Title of each class |
|
Trading Symbol(s) |
|
Name of each exchange on which registered |
|
|
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the Registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☐
Indicate by check mark if the Registrant is not required to file reports pursuant to Section 13 or 15(d) of the Act. Yes ☐
Indicate by check mark whether the Registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Indicate by check mark whether the Registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the Registrant was required to submit such files).
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer |
|
☐ |
|
Accelerated filer |
|
☐ |
|
|
|
|
|||
|
☒ |
|
Smaller reporting company |
|
||
|
|
|
|
|
|
|
Emerging growth company |
|
|
|
|
|
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit
report.
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements.
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐
Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes
The aggregate market value of the voting and non-voting common equity held by non-affiliates of the Registrant, based on the closing price of the shares of common stock on The NASDAQ Stock Market on June 30, 2023 was $
The number of shares of Registrant’s Common Stock outstanding as of February 29, 2024, was
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the registrant’s definitive proxy statement to be prepared for use in connection with the registrant’s 2024 annual meeting of shareholders have been incorporated by reference into Part III of this Annual Report on Form 10-K.
GULF ISLAND FABRICATION, INC.
ANNUAL REPORT ON FORM 10-K FOR
THE FISCAL YEAR ENDED DECEMBER 31, 2023
TABLE OF CONTENTS
i
GLOSSARY OF TERMS
As used in this report filed on form 10-K for the year ended December 31, 2023 (“2023 Annual Report” or “this Report”), the following abbreviations and terms have the meanings listed below. In addition, the terms “Gulf Island,” “the Company,” “we,” “us” and “our” refer to Gulf Island Fabrication, Inc. and its consolidated subsidiaries, unless the context clearly indicates otherwise. Certain terms defined below may be redefined separately within this Report when we believe providing a definition upon the first use of the term will assist users of this Report. Unless and as otherwise stated, any references in this Report to any agreement means such agreement and all schedules, exhibits and attachments in each case as amended, restated, supplemented or otherwise modified to the date of filing this Report.
2022 Annual Report |
|
Our annual report for the year ended December 31, 2022, filed with the SEC on Form 10-K on March 28, 2023. |
|
|
|
2022 Financial Statements |
|
Our Financial Statements for the year ended December 31, 2022 and related notes, included in our 2022 Annual Report. |
|
|
|
ASC |
|
Accounting Standards Codification. |
|
|
|
ASU |
|
Accounting Standards Update. |
|
|
|
Balance Sheet |
|
Our Consolidated Balance Sheets, as filed in this Report. |
|
|
|
Board |
|
Board of Directors. |
|
|
|
Cash-Settled RSUs |
|
RSUs settled in cash. |
|
|
|
contract assets |
|
Costs and estimated earnings recognized to date in excess of cumulative billings. |
|
|
|
contract liabilities |
|
Cumulative billings in excess of costs and estimated earnings recognized to date and accrued contract losses. |
|
|
|
cost-reimbursable |
|
Work is performed and billed to the customer at cost plus a profit margin or other variable fee arrangements which can include a mark-up. |
|
|
|
COVID-19 |
|
The global coronavirus pandemic. |
|
|
|
deck |
|
The component of a platform on which drilling, production, separating, gathering, piping, compression, well support, crew quartering and other functions related to offshore oil and gas development are conducted. |
|
|
|
DTA(s) |
|
Deferred Tax Asset(s). |
|
|
|
EPC |
|
Engineering, Procurement and Construction. |
|
|
|
ESG |
|
Environmental, Social and Governance. |
|
|
|
Exchange Act |
|
Securities Exchange Act of 1934, as amended. |
|
|
|
Fabrication Division |
|
Our Fabrication reportable segment. |
|
|
|
Facilities |
|
Our Houma Facilities and other facilities that support our operations. |
|
|
|
FASB |
|
Financial Accounting Standards Board. |
|
|
|
FDC |
|
Fidelity & Deposit Company of Maryland. |
|
|
|
Ferry Projects |
|
Contracts and related obligations for our seventy-vehicle ferry and two forty-vehicle ferry projects that were under construction as of the date of the Shipyard Transaction, which were excluded from the Shipyard Transaction. |
|
|
|
Financial Statements |
|
Our Consolidated Financial Statements, including comparative consolidated Balance Sheets, Statements of Operations, Statements of Changes in Shareholders' Equity and Statements of Cash Flows, as filed in this Report. |
|
|
|
GAAP |
|
Generally Accepted Accounting Principles in the U.S. |
|
|
|
GIS |
|
Gulf Island Shipyards, LLC. |
|
|
|
GOM |
|
Gulf of Mexico. |
|
|
|
Gulf Coast |
|
Along the coast of the Gulf of Mexico. |
ii
|
|
|
Hornbeck |
|
Hornbeck Offshore Services, LLC. |
|
|
|
Houma AHFS |
|
Certain property sold in February 2024 that was part of our Houma Facilities, which was classified as an asset held for sale on our Balance Sheet at December 31, 2023. |
|
|
|
Houma Facilities |
|
Our owned facilities located in Houma, Louisiana that support our Fabrication Division and Services Division and represent our primary operating facilities. |
|
|
|
Incentive Plans |
|
Long-term incentive plans under which equity or cash-based awards may be made to eligible employees and non-employee directors. |
|
|
|
inland |
|
Typically, bays, lakes and marshy areas. |
|
|
|
Insurance Finance Arrangements |
|
Short-term finance arrangements for insurance premiums associated with our property and equipment and general liability insurance coverages. |
|
|
|
ISO |
|
International Standard Organization based in Geneva, Switzerland. |
|
|
|
jacket |
|
A component of a fixed platform consisting of a tubular steel braced structure extending from the mudline of the seabed to a point above the water surface. The jacket is anchored with tubular steel piles driven into the seabed. The jacket supports the deck structure located above the water. |
|
|
|
labor hours |
|
Hours worked by employees directly involved in the production of our products or delivery of our services. |
|
|
|
LC Facility |
|
Our $10.0 million letter of credit facility with Whitney Bank maturing on June 30, 2024, as amended. |
|
|
|
LNG |
|
Liquefied Natural Gas. |
|
|
|
Mortgage Agreement |
|
Multiple indebtedness mortgage arrangement with Zurich, to secure our obligations and liabilities under our Note Agreement and general indemnity agreement with Zurich associated with an outstanding surety bond for our forty-vehicle ferry projects. The mortgage arrangement encumbers the real estate associated with our Houma Facilities and includes certain covenants and events of default. |
|
|
|
modules |
|
Fabricated structures that include structural steel, piping, valves, fittings, storage vessels and other equipment that are incorporated into a refining, petrochemical, LNG or industrial system. |
|
|
|
MPSV(s) |
|
Multi-Purpose Supply Vessel(s). |
|
|
|
MPSV Litigation |
|
The lawsuit filed in the Twenty-Second Judicial District Court for the Parish of St. Tammany, State of Louisiana and was styled Gulf Island Shipyards, LLC v. Hornbeck Offshore Services, LLC, bearing docket number 2018-14861, which was resolved on October 4, 2023. |
|
|
|
Note Agreement |
|
Promissory note entered into with Zurich on November 6, 2023, in connection with the resolution of our MPSV Litigation, pursuant to which we will pay Zurich $20.0 million, plus interest at a fixed rate of 3.0% per annum, payable in 15 equal annual installments beginning on December 31, 2024. |
|
|
|
NOL(s) |
|
Net operating loss(es) that are available to offset future taxable income, subject to certain limitations. |
|
|
|
offshore |
|
In unprotected waters outside coastlines. |
|
|
|
onshore |
|
Inside the coastline on land. |
|
|
|
OPEC |
|
Organization of the Petroleum Exporting Countries. |
|
|
|
Performance Bonds |
|
The performance bonds issued by Zurich in connection with the construction of two MPSVs that were subject to our MPSV Litigation, for which the face amount of the bonds totaled $50.0 million, and for which the obligations under the performance bonds were terminated on November 6, 2023, in connection with the Settlement Agreement and Note Agreement. |
|
|
|
performance obligation |
|
A contractual obligation to construct and transfer a distinct good or service to a customer. It is the unit of account in Topic 606. The transaction price of a contract is allocated to each distinct performance obligation and recognized as revenue when, or as, the performance obligation is satisfied. |
|
|
|
piles |
|
Rigid tubular pipes that are driven into the seabed to anchor a jacket. |
|
|
|
platform |
|
A structure from which offshore oil and gas development drilling and production are conducted. |
|
|
|
POC |
|
Percentage-of-completion. |
iii
|
|
|
PPP Loan |
|
Our previous loan from Whitney Bank forgiven pursuant to the Paycheck Protection Program. |
|
|
|
Restrictive Covenant Agreement |
|
Our previous restrictive covenant arrangement with Zurich to secure our obligations and liabilities under our general indemnity agreement with Zurich associated with outstanding surety bonds for certain contracts that precluded us from paying dividends or repurchasing shares of our common stock, which was terminated on November 6, 2023, in connection with the Settlement Agreement and Note Agreement. |
|
|
|
RSUs |
|
Restricted Stock Units. |
|
|
|
SBA |
|
Small Business Administration. |
|
|
|
SEC |
|
U.S. Securities and Exchange Commission. |
|
|
|
Services Division |
|
Our Services reportable segment. |
|
|
|
Settlement Agreement |
|
Agreement entered into with Zurich on November 6, 2023, in connection with the resolution of our MPSV Litigation, pursuant to which, among other things, Zurich released GIS and the Company from all of their obligations under the Performance Bonds and the associated general indemnity agreements relating to the Performance Bonds, and we agreed to release possession of the MPSVs to Zurich. |
|
|
|
Share Repurchase Program |
|
Share repurchase program authorizing the repurchase of up to $5.0 million of our outstanding common stock, effective from December 15, 2023 through December 15, 2024. |
|
|
|
Shipyard Division |
|
Our Shipyard reportable segment. |
|
|
|
Shipyard Transaction |
|
The sale of our Shipyard Division’s operating assets and certain construction contracts in the second quarter 2021, which excluded the contracts and related obligations for our Ferry Projects and the contracts and related obligations for the projects that were subject to our MPSV Litigation. |
|
|
|
Spud barge |
|
Construction barge rigged with vertical tubular or square lengths of steel pipes that are lowered to anchor the vessel. |
|
|
|
Statement of Cash Flows |
|
Our Consolidated Statements of Cash Flows, as filed in this Report. |
|
|
|
Statement of Operations |
|
Our Consolidated Statements of Operations, as filed in this Report. |
|
|
|
Statement of Shareholders’ Equity |
|
Our Consolidated Statements of Changes in Shareholders’ Equity, as filed in this Report. |
|
|
|
Surety or Sureties |
|
A financial institution that issues bonds to customers on behalf of the Company for the purpose of providing third-party financial assurance related to the performance of our contracts. Payments by the Surety pursuant to a bond in the event of non-performance are subject to reimbursement to the Surety by us under a general indemnity agreement. |
|
|
|
T&M |
|
Time and materials. Work is performed and billed to the customer at contracted time and material rates. |
|
|
|
Topic 606 |
|
The revenue recognition criteria prescribed under ASU 2014-09, “Revenue from Contracts with Customers”. |
|
|
|
U.S. |
|
The United States of America. |
|
|
|
USL&H |
|
United States Longshoreman and Harbor Workers Act. |
|
|
|
VA(s) |
|
Valuation Allowance(s). |
|
|
|
Whitney Bank |
|
Hancock Whitney Bank. |
|
|
|
Zurich |
|
FDC and Zurich American Insurance Company. |
|
|
|
iv
Cautionary Statement on Forward-Looking Information
This Report contains forward-looking statements in which we discuss our potential future performance, operations and projects. Forward-looking statements, within the meaning of the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995, are all statements other than statements of historical facts, such as projections or expectations relating to operating results; diversification and entry into new end markets; improvement of risk profile; industry outlook; oil and gas prices; timing of investment decisions and new project awards; cash flows and cash balance; capital expenditures; tax rates; implementation of our share repurchase program; liquidity; and execution of strategic initiatives. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “targets,” “intends,” “likely,” “will,” “should,” “to be,” “potential” and any similar expressions are intended to identify those assertions as forward-looking statements. The timing and amount of any share repurchases will be at the discretion of management and will depend on a variety of factors including, but not limited to, our operating performance, cash flow and financial position, the market price of our common stock and general economic and market conditions. The share repurchase program may be modified, increased, suspended or terminated at any time at the Board’s discretion.
We caution readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, projected or assumed in the forward-looking statements. Important factors that can cause our actual results to differ materially from those anticipated in the forward-looking statements include: supply chain disruptions, inflationary pressures, economic slowdowns and recessions, natural disasters, public health crises, labor costs and geopolitical conflicts, and the related volatility in oil and gas prices and other factors impacting the global economy; cyclical nature of the oil and gas industry; competition; reliance on significant customers; competitive pricing and cost overruns on our projects; performance of subcontractors and dependence on suppliers; timing and our ability to secure and commence execution of new project awards, including fabrication projects for refining, petrochemical, LNG, industrial and sustainable energy end markets; our ability to maintain and further improve project execution; nature of our contract terms and customer adherence to such terms; suspension or termination of projects; changes in contract estimates; customer or subcontractor disputes; operating dangers, weather events and availability and limits on insurance coverage; operability and adequacy of our major equipment; our ability to raise additional capital; our ability to amend or obtain new debt financing or credit facilities on favorable terms; our ability to generate sufficient cash flow; our ability to resolve any material legal proceedings; our ability to execute our share repurchase program and enhance shareholder value; our ability to obtain letters of credit or surety bonds and ability to meet any indemnification obligations thereunder; consolidation of our customers; financial ability and credit worthiness of our customers; adjustments to previously reported profits or losses under the percentage-of-completion method; our ability to employ a skilled workforce; loss of key personnel; utilization of facilities or closure or consolidation of facilities; failure of our safety assurance program; barriers to entry into new lines of business; weather impacts to operations; any future asset impairments; changes in trade policies of the U.S. and other countries; compliance with regulatory and environmental laws; lack of navigability of canals and rivers; systems and information technology interruption or failure and data security breaches; performance of partners in any future joint ventures and other strategic alliances; shareholder activism; and other factors described under “Risk Factors” in Part I, Item 1A of this Report and as may be further updated by subsequent filings with the SEC.
Additional factors or risks that we currently deem immaterial, that are not presently known to us or that arise in the future could also cause our actual results to differ materially from our expected results. Given these uncertainties, investors are cautioned that many of the assumptions upon which our forward-looking statements are based are likely to change after the date the forward-looking statements are made, which we cannot control. Further, we may make changes to our business plans that could affect our results. We caution investors that we undertake no obligation to publicly update or revise any forward-looking statements, which speak only as of the date made, for any reason, whether as a result of new information, future events or developments, changed circumstances, or otherwise, and notwithstanding any changes in our assumptions, changes in business plans, actual experience or other changes.
1
PART I
Items 1. and 2. Business and Properties
Certain terms are defined in the “Glossary of Terms” beginning on page ii. References to “Notes” relate to the Notes to our Consolidated Financial Statements (“Financial Statements”) in Item 8.
Description of Operations
Gulf Island Fabrication, Inc. (together with its subsidiaries, “Gulf Island,” “the Company,” “we,” “us” and “our”) is a Louisiana corporation, which was incorporated in 1985. We are a leading fabricator of complex steel structures and modules and provider of specialty services, including project management, hookup, commissioning, repair, maintenance, scaffolding, coatings, welding enclosures, civil construction and staffing services to the industrial and energy sectors. Our customers include U.S. and, to a lesser extent, international energy producers; refining, petrochemical, LNG, industrial and power operators; and EPC companies. Our corporate headquarters is located in The Woodlands, Texas and our primary operating facilities are located in Houma, Louisiana (“Houma Facilities”). See “Overview” section in Item 7 for discussion of our current business and outlook.
We currently operate and manage our business through three operating divisions (“Services”, “Fabrication” and “Shipyard”) and one non-operating division (“Corporate”), which represent our reportable segments. Our three operating divisions and Corporate Division are discussed below.
Services Division – Our Services Division provides maintenance, repair, construction, scaffolding, coatings, welding enclosures and other specialty services on offshore platforms and inland structures and at industrial facilities; provides services required to connect production equipment and service modules and equipment on offshore platforms; provides project management and commissioning services; provides industrial staffing services; and performs municipal and drainage projects, including pump stations, levee reinforcement, bulkheads and other public works. Our services activities are managed from our various Facilities.
Fabrication Division – Our Fabrication Division fabricates modules, skids and piping systems for onshore refining, petrochemical, LNG and industrial facilities and offshore facilities; fabricates foundations, secondary steel components and support structures for alternative energy developments and coastal mooring facilities; fabricates offshore production platforms and associated structures, including jacket foundations, piles and topsides for fixed production and utility platforms, as well as hulls and topsides for floating production and utility platforms; and fabricates other complex steel structures and components. Our fabrication activities are performed at our Houma Facilities.
Shipyard Division – Our Shipyard Division previously fabricated newbuild marine vessels and provided marine repair and maintenance services. However, in the second quarter 2021, we sold our Shipyard Division operating assets and certain construction contracts (“Shipyard Transaction”). The Shipyard Transaction excluded the contracts and related obligations for our seventy-vehicle ferry and two forty-vehicle ferry projects (collectively, “Ferry Projects”) that were under construction as of the transaction date, and excluded the contracts and related obligations for the projects that were subject to our MPSV Litigation, which was resolved on October 4, 2023. Construction of the Ferry Projects was performed at our Houma Facilities and the wind down of our remaining Shipyard Division operations was substantially completed in the fourth quarter 2023. Final completion of the wind down will occur upon completion of the warranty periods for the Ferry Projects, the last of which is anticipated to occur in the first quarter 2025. See Note 1 for further discussion of the Shipyard Transaction, Note 2 for further discussion of our Ferry Projects and Note 7 for further discussion of the resolution of our MPSV Litigation.
Corporate Division and Allocations – Our Corporate Division includes costs that do not directly relate to our operating divisions. Such costs include, but are not limited to, costs of maintaining our corporate office, executive management salaries and incentives, board of directors’ fees, certain insurance costs and costs associated with overall corporate governance and reporting requirements for a publicly traded company. Shared resources and costs that benefit more than one operating division are allocated amongst the operating divisions based on each operating division’s estimated share of the benefit received. Such costs include, but are not limited to, human resources, insurance, information technology, accounting, business development and certain division leadership.
2
Facilities and Equipment
Houma Facilities – Our fabrication and primary administrative and operating facilities are located in Houma, Louisiana (“Houma Facilities”) on approximately 160 acres on the east bank of the Houma Navigation Canal, approximately 30 miles from the Gulf of Mexico (“GOM”). The owned facility includes approximately 73,000 square feet of administrative and operations facilities, 242,000 square feet of covered fabrication facilities, 90,000 square feet of warehouse facilities, and 16,000 square feet of blasting and coating facilities. It also has 3,305 linear feet of water frontage, including 2,056 feet of steel bulkheads. Buildings and equipment that are significant to our Houma Facilities include:
In February 2024, we sold certain property of our Fabrication Division that was part of our Houma Facilities. The property sold was classified as an asset held for sale (“Houma AHFS”) on our Balance Sheet at December 31, 2023. The Houma AHFS are excluded from the property description discussed above. See Note 3 and “Overview” in Item 7 for further discussion of our Houma AHFS.
We have a Mortgage Agreement associated with the real estate of our Houma Facilities that secures our obligations and liabilities under our Note Agreement and general indemnity agreement with Zurich associated with an outstanding surety bond for our forty-vehicle ferry projects. See Note 4 and “Liquidity and Capital Resources” in Item 7 for further discussion of our Mortgage Agreement and Note Agreement.
Other Facilities – Our other administrative and operating facilities (together with our Houma Facilities, “Facilities”) include:
Materials, Supplies and Subcontractors
The principal materials and supplies used in our operations across all our divisions include standard steel shapes, steel plate, steel pipe, welding gases, welding wire, fuel, oil and paint, all of which are currently available from many sources. We do not depend upon any single supplier or source for our materials and supplies. We anticipate being able to obtain these materials for the foreseeable future; however, the pricing, availability and delivery schedules offered by our suppliers may vary significantly from year to year due to various factors, including supply chain disruptions, labor shortages, wage pressures, rising inflation and potential economic slowdown or recession, public health crises, geopolitical conflicts, foreign currency exchange rate fluctuations, supplier consolidations, supplier raw material shortages, customer demand, and any duties and tariffs imposed on the materials or other import restrictions. In 2023, we continued to experience increased costs of materials and supplies due to inflation and continued supply chain delays and shortages. While pricing and availability of materials and supplies did not significantly impact our results in 2022 or 2023, these issues may continue and may have a more significant impact on our results in 2024. See “Risk Factors” in Item 1A for further discussion of our use of raw materials and supplies and the impact of global macroeconomic conditions and geopolitical conditions on our operations.
3
The majority of the steel plate used in our operations arrives at our facilities in bulk, which we then cut into the form needed or roll into tubular sections in our rolling mill. Tubular sections can be welded together in long straight tubes to become legs or into shorter tubes to become part of a network of bracing. Various cuts and welds in the fabrication process are performed by computer-controlled equipment. We procure steel from both domestic and foreign mills. Delivery from domestic steel mills can take weeks or months and delivery from foreign steel mills, including transit time, can take several months. Additionally, the U.S. sometimes imposes tariffs on certain imported steel which can result in higher cost for foreign steel. To mitigate the risk of increasing cost of materials during the life of a contract, we often negotiate escalation clauses in our customer contracts for steel pricing adjustments tied to changes in relevant indices.
In addition to the materials and supplies described above used in our fabrication process, we also use third-party manufacturers for engineered and manufactured equipment added to the structures and modules that we fabricate. To mitigate our risk of increasing costs, we often negotiate and purchase such equipment from the manufacturer at a fixed price. Additionally, we may use subcontractors when their use enables us to meet customer requirements for resources, schedule, cost or technical expertise. Subcontractors may range from small local entities to companies with global capabilities, some of which may be utilized on a repetitive or preferred basis.
Human Capital Management
Our employees are our most important assets and serve as the foundation for our ability to achieve our financial and strategic objectives.
Employee Statistics – Our workforce varies based on our level of activity at any particular time. At December 31, 2023, we had 839 full-time employees and two part-time employees, compared to 874 full-time employees and one part-time employee at December 31, 2022. In addition, we often use independent contract labor to supplement our workforce, and at December 31, 2023 and 2022, we had 94 and 83, respectively, of independent contract labor personnel. None of our employees are employed under a collective bargaining agreement and we believe our relationship with our employees is favorable. Labor hours worked during 2023 and 2022 were 1.7 million and 1.7 million, respectively. See “Risk Factors” in Item 1A for further discussion of our use of contract labor and industry-wide labor constraints.
Recruitment, Training and Workforce Development – Our success depends on our ability to attract, develop, motivate and retain a highly-skilled workforce that includes craft labor as well as supervision and project management. To support the development of our workforce, we offer supervision and other training programs to educate and elevate the skillsets of our front-line leaders. We also provide internal hands-on technical fitting and welding training programs and instruction to develop our craft labor and maintain high quality standards. We have also created a succession plan for all senior leadership positions. During 2022, we were awarded a Texas Workforce Commission Skills Development grant. These funds enhance our ability to deliver on-demand technical training to help develop the next generation of skilled craft professionals in pipe fitting, welding, scaffold building, painting/blasting, equipment operation, and rigging in our rapidly growing industry. The grant enabled us to train 220 and 284 employees during 2023 and 2022, respectively. During 2022, we were also awarded an Incumbent Worker Training Program grant through the Louisiana Workforce Commission. This program provides supplemental funding for, among other things, skills, safety and environmental training through third-party providers for craft personnel and leadership. The grant enabled us to train 552 and 91 employees during 2023 and 2022, respectively.
Employee Benefits – Our compensation programs are designed to attract, motivate and retain our employees. We provide competitive base wages and salaries consistent with employee positions, skills and experience levels, and geographic locations. Employees are eligible to receive paid and unpaid leave and participate in our health insurance and life, disability and accident insurance programs. We also offer retirement benefits through our 401(k) plan, which includes discretionary Company-matching contributions. During 2023 and 2022, we conducted annual employee benefits surveys to gain a better understanding of how our various benefit programs are valued by our employees. The employee feedback indicated a desire for additional medical plan options, a preference for smartphone and email communication, and more education on health wellness and long-term care. As a result, we included a high-deductible health plan option and health savings account option in our benefit program offerings for 2023 and 2022, along with an identity theft benefit offering, and incorporated health wellness incentives and expanded education opportunities into our benefit program offerings for 2024.
Employee Engagement – During 2023 and 2022, we incorporated feedback from our employees into our training and safety programs and employee benefit program offerings. The feedback was gathered from our employee satisfaction and safety culture surveys performed during 2023, and our annual employee benefits survey conducted in 2023 and 2022, which provided employee perspectives on working for the Company and suggestions for improvements.
4
Diversity and Inclusion – Our commitment to diversity extends across all divisions and disciplines of our business. We leverage multiple platforms to expand our reach for diverse talent and also use recruiting sites focused on veterans and individuals with disabilities. At December 31, 2023 and 2022, approximately 54% and 51%, respectively, of our workforce were women or minorities. During each of 2023 and 2022, we conducted our annual leadership workshop for approximately 150 front-line leaders, respectively, that consisted of, among other things, a two-day interactive training on communication skills, mental health awareness, leading the “younger generations” and prevention of sexual harassment. During 2023, we also began tracking our annual spend with veteran and minority owned vendors in connection with our diversity, equity and inclusion initiatives.
See “Risk Factors” in Item 1A for further discussion of our ability to attract and retain qualified employees.
Safety
We are committed to the safety and health of our employees and contractors and believe that a strong safety culture is a critical element of our success. We continue to improve and maintain a comprehensive safety management system designed to ensure the safety of our employees and contractors and allow us to remain in compliance with all applicable federal and state mandated safety regulations. We are committed to maintaining a well-trained workforce and providing timely instruction to ensure our employees have the knowledge and skills to perform their work safely while maintaining the highest standards of quality. We provide continuous safety education and training to employees and contractors on a variety of topics to ensure they are ready for the challenges inherent in all our projects. Our employees commence training on their first day of employment with a comprehensive orientation class that addresses Company policies and procedures and provides clear expectations for working safely. During 2022, our health, safety and environmental training system was audited and accredited by a third-party compliance organization.
During 2023 and 2022, we completed supervisor safety workshops that were delivered to leadership, including our front-line supervisors. The focus of these workshops is to drive a strong safety culture, incorporate human performance and risk tolerance principles, and emphasize the supervisor’s role in safety coaching and mentoring. During 2023 and 2022, we successfully trained approximately 100% and 98%, respectively, of our front-line supervision. We also continued to emphasize the “execution diamond”, a tool to drive our employees and contractors to plan, stop and think before engaging in an activity, perform appropriate risk assessments, and use their “stop work” authority. Our total recordable incident rate for 2023 and 2022 was 0.55 and 0.38, respectively. During 2023, and 2022, we also began tracking our “significant incident and fatality” potential incidents, which indicated our rate for 2023 and 2022 was 0.64 and 1.03, respectively.
We have a zero-tolerance policy for drugs and alcohol use in the workplace. We support this policy through the application of a comprehensive drug and alcohol screening program that includes initial screenings for all employees during our hiring process and periodic random screenings throughout employment. Additionally, we require our contractors to follow alcohol and drug screening policies substantially the same as our policy.
Our employees are given opportunities to be a part of a dedicated safety committee which is comprised of peer-elected craft employees and members of management to assist in supporting our efforts to continuously improve safety performance. A safety component is also included in our annual incentive program guidelines for our executive officers and other key employees. See “Risk Factors” in Item 1A for further discussion of the importance of safety in our operations.
Environmental
Our commitment to protecting the environment continues to be a strong principle that governs our work. We continuously look for ways to reduce our environmental impact, including a focus on protecting the land, water, and wildlife habitats in our surrounding communities, with an emphasis on spill prevention, water and waste management, air emissions and other natural resource conservation. We are further focused on energy efficiency and reducing our carbon footprint within our daily operations. During 2023 and 2022, we continued our efforts in managing and monitoring our air emissions, water discharges, energy consumption and greenhouse gases. This monitoring will allow us to establish baseline emission matrices based on the various types of fabrication projects we perform. During 2022, we also conducted hazardous waste minimization and pollution prevention training for our employees.
We are also focused on managing and monitoring our air emissions related to all facets of our painting and blasting operations to ensure compliance with our Louisiana Department of Environmental Quality operating air permits. We monitor and report criteria pollutants and toxic air pollutants, which includes daily tracking of our paint, thinner and cleaning solvents usage. We have also implemented abrasive blasting management best practices to reduce particulate matter emissions and reduce offsite impacts to surrounding communities from our abrasive blasting activities. This includes routine inspections, record keeping and personnel training.
5
Our environmental management system is certified by ISO 14001:2015, which represents internationally recognized standards for environmental management overseen by the International Standard Organization (“ISO”) based in Geneva, Switzerland. This certification helps our management and employees ensure we are measuring and improving our environmental impact by improving the efficiency of our resources, consistently addressing environmental obligations and reducing waste and environmental risks. The certification helps us maintain our commitment to protecting the environment as a leader in the fabrication industry. The certification is based on a review of our programs and procedures and is subject to annual audit and full recertification every three years. The last audit of our certification occurred in March 2023. Our environmental management system was recertified in January 2024, and the certification is valid through January 2027.
Quality Assurance
We use modern welding and fabrication technology, and all of our fabrication projects are executed in accordance with industry standards, specifications and regulations, including those published by the American Petroleum Institute, the American Welding Society, the American Society of Mechanical Engineers, the American Bureau of Shipping, the U.S. Coast Guard and customer specifications. We maintain training programs for technical fitting and welding instruction in order to prepare and upgrade our skilled labor workforce, and to maintain high standards of quality. In addition, we maintain on-site facilities for the non-destructive testing of all welds, a process performed by independent third-parties.
Our quality management systems are certified by ISO 9001-2015, which represents internationally recognized standards for quality management. Similar to our environmental certification, this certification is based on a review of our programs and procedures and is subject to annual audit and full recertification every three years. Our quality management systems were audited and recertified in March 2023, and the certification is valid through March 2026. Our quality management systems are also certified by the American Institute of Steel Construction and American Society of Mechanical Engineers, for which the certifications are valid through July 2024 and November 2024, respectively.
Customers
Our principal customers include U.S. and, to a lesser extent, international energy producers; refining, petrochemical, LNG, industrial and power operators; and EPC companies. A large portion of our revenue in any given year may be generated by only a few customers, although not necessarily the same customers from year to year. For 2023, two customers accounted for 53% of our consolidated revenue (excluding the negative revenue charge associated with the resolution of our MPSV Litigation for our Shipyard Division), one of which related to offshore services for our Services Division and small-scale fabrication for our Fabrication Division and the other related to our offshore jackets project for our Fabrication Division. For 2022, two customers accounted for 48% of our consolidated revenue, which related to offshore services for our Services Division and small-scale fabrication for our Fabrication Division.
Contracting
Our revenue is derived from customer contracts and agreements that are awarded on a competitively bid and negotiated basis using a range of contracting options, including fixed-price, unit-rate, time and materials (“T&M”) and cost-reimbursable, or a combination thereof. Our contracts primarily relate to certain service arrangements and the fabrication of steel structures and modules. Such contracts vary in duration depending on the size and complexity of the project.
Revenue for our long-term contracts is recognized using the percentage-of-completion method, based on contract costs incurred to date compared to total estimated contract costs. Contract costs include direct costs, such as materials and labor, and indirect costs attributable to contract activity. Material costs that are significant to a contract and do not reflect an accurate measure of project completion are excluded from the determination of our contract progress. Revenue for such materials is only recognized to the extent of costs incurred.
Revenue for our short-term contracts (which includes revenue associated with our master services arrangements) and contracts that do not satisfy the criteria for revenue recognition over time is recognized when the work is performed or when control of the asset is transferred, the related costs are incurred and collection is reasonably assured. See Notes 1 and 2, “Risk Factors” in Item 1A, and “Critical Accounting Policies” in Item 7 for further discussion of our contracting terms and revenue recognition.
6
New Project Awards and Backlog
New project awards represent expected revenue values of new contract commitments received during a given period, including scope growth on existing commitments. A commitment represents authorization from our customer to begin work or purchase materials pursuant to a written agreement, letter of intent or other form of authorization. Backlog represents the unrecognized revenue for our new project awards and at December 31, 2023, was consistent with the value of remaining performance obligations for our contracts required to be disclosed under Topic 606 and presented in Note 2. In general, a performance obligation is a contractual obligation to construct and/or transfer a distinct good or service to a customer. The transaction price of a contract is allocated to each distinct performance obligation and recognized as revenue when, or as, the performance obligation is satisfied. We believe that backlog, a non-GAAP financial measure, provides useful information to investors as it represents work that we are obligated to perform under our current contracts. New project awards and backlog may vary significantly each reporting period based on the timing of our major new contract commitments.
Projects in our backlog are generally subject to delay, suspension, termination, or an increase or reduction in scope at the option of the customer; however, the customer is required to pay us for work performed and materials purchased through the date of termination, suspension, or decrease in scope. Depending on the size of the project, the delay, suspension, termination or increase or decrease in scope of any one contract could significantly impact our backlog and change the expected amount and timing of revenue recognized. See “New Project Awards and Backlog” in Item 7 for further discussion of our new project awards and backlog, and Notes 1 and 2, “Risk Factors” in Item 1A, and “Critical Accounting Policies” in Item 7, for further discussion of our contracting terms and revenue recognition.
Seasonality
Our operations may be subject to seasonal variations due to weather conditions, including any seasonal weather conditions that may increasingly arise due to the effects of climate change, and available daylight hours. Although we have large, covered fabrication facilities, a significant amount of our construction activities continue to take place outdoors, and accordingly, the number of labor hours worked may decline during the winter months due to unfavorable weather conditions and a decrease in daylight hours. In addition, the seasonality of oil and gas industry activity in the Gulf Coast region also affects our operations. Our offshore oil and gas customers often schedule the completion of their projects during the summer months in order to take advantage of more favorable weather during such months. Further, rainy weather, tropical storms, hurricanes and other storms prevalent in the GOM and along the Gulf Coast may also affect our operations. See “Risk Factors” in Item 1A for further discussion of the impacts seasonal weather conditions and extreme adverse weather events have on our operations.
Competition
We operate within highly competitive markets which are significantly impacted by oil and gas prices. Declines in oil and gas prices can create excess capacity and under-utilization of our competitor’s facilities, resulting in more intense competition in the bidding process for new project awards. Previous decreases in oil and gas prices have led many companies, including us, to reduce their skilled workforce. These reductions, with a subsequent increase in oil and gas prices, have created a competitive labor market, resulting in higher cost of labor, including increases in wage rates and the cost of recruiting and training to attract and retain qualified personnel. In addition, we expect to face increased competition as we seek fabrication opportunities related to rapidly growing energy transition initiatives, including in support of our customers who are making energy transitions away from fossil fuels, opportunities related to offshore wind developments and future onshore infrastructure projects where modular designed steel structures are core to the execution strategy. Further, there are numerous regional, national and global competitors that offer similar services to those offered by each of our operating divisions. These competitors may be larger than us with more resources and facilities in both the U.S. and abroad. Competition with foreign competitors can also be challenging as such competitors often have lower operating costs and lower wage rates, and foreign governments often use subsidies and incentives to create local jobs and impose import duties and fees on products. In addition, technological innovations have lowered transportation costs and increased the competitiveness of foreign competitors when exporting structures from foreign locations to the GOM and Gulf Coast, which may hinder our ability to successfully secure new awards for projects destined for the GOM and Gulf Coast. Uncertainties with respect to tariffs on materials and fluctuations in the value of the U.S. dollar and other factors, may also impact our ability to compete effectively.
Although we believe price and the contractor’s ability to meet a customer’s delivery schedule and project requirements are principal factors in determining which contractor is awarded a project, customers also consider, among other things, a contractor’s past project experience, the availability of technically capable personnel, facility capacity and location, production efficiency, condition of equipment, reputation, safety record, customer relations and financial strength. We believe that our strategic location, competitive pricing, expertise in fabricating and servicing onshore and offshore structures and facilities, and the certification of our facilities as ISO 9001-2015 will enable us to continue to compete effectively for projects. See “Risk Factors” in Item 1A for further discussion of the competitive landscape in the industries we serve.
7
Government and Environmental Regulation
Our operations and properties are subject to a wide variety of increasingly complex and stringent federal, state and local environmental laws and other regulations, including those governing discharges into the air and water, the handling and disposal of solid and hazardous wastes, and the remediation of soil and groundwater contaminated by hazardous substances. Compliance with many of these laws is becoming increasingly complex, stringent and expensive. These laws may impose “strict liability” for damages to natural resources and threats to public health and safety, rendering a party liable for the environmental damage without regard to negligence or fault on the part of such party.
Our operations are also governed by laws and regulations relating to the health and safety of our employees, primarily the Occupational Safety and Health Act and regulations promulgated thereunder. Various governmental and quasi-governmental agencies require certain permits, licenses and certificates with respect to our operations. We believe that we have all material permits, licenses and certificates necessary for the conduct of our existing business.
Our employees may engage in certain activities, including interconnect piping and other service activities conducted on offshore platforms, activities performed on spud barges owned or chartered by us, and barges owned by us, that are covered in either the provisions of the Jones Act or U.S. Longshoreman and Harbor Workers Act (“USL&H”). These laws make the liability limits established under state workers’ compensation laws inapplicable to these employees and permit them or their representatives to pursue actions against us for damages or job-related injuries, with generally no limitations on our potential liability.
Many aspects of our operations and properties are materially affected by federal, state and local regulations, as well as certain international conventions and private industry organizations. The exploration and development of oil and gas properties located on the outer continental shelf of the U.S. is regulated primarily by the Bureau of Ocean Energy Management and Enforcement of the Department of Interior, which is responsible for the administration of federal regulations under the Outer Continental Shelf Lands Act requiring the construction of offshore platforms located on the outer continental shelf to meet stringent engineering and construction specifications. Violations of these regulations and related laws can result in substantial civil and criminal penalties as well as injunctions curtailing operations. We believe that our operations are in compliance with these and all other regulations affecting the fabrication of platforms for delivery to the outer continental shelf of the U.S. In addition, demand for our services from the oil and gas industry can be affected by changes in taxes, price controls and other laws and regulations affecting this industry. It is also possible that the current administration and Congress will impose additional environmental regulations that will restrict federal oil and gas leasing, permitting or drilling practices on public lands and waters. Offshore construction and drilling in certain areas has also been opposed by environmental groups and, in certain areas, has been restricted. To the extent laws are enacted or other governmental actions are taken that prohibit or restrict offshore construction and drilling or impose environmental protection requirements that result in increased costs to the oil and gas industry in general and the offshore construction industry in particular, our business and prospects could be adversely affected. We cannot determine to what extent future operations and earnings may be affected by new legislation, new regulations or changes in existing regulations.
In addition, we could be affected by future laws or regulations, including those imposed in response to concerns over climate change, other aspects of the environment, or natural resources. Due to concerns that carbon dioxide, methane and certain other greenhouse gases may produce climate changes that have significant impacts on public health and the environment, various governmental authorities have considered and are continuing to consider the adoption of regulatory strategies and controls designed to reduce the emission of greenhouse gases resulting from regulated activities, which if adopted in areas where we conduct business, could require us or our customers to incur additional compliance costs, may result in delays in the pursuit of regulated activities, prevent customers’ projects from going forward and could adversely affect demand for the oil and natural gas that some of our customers produce, thereby potentially limiting demand for our services. For example, the Inflation Reduction Act of 2022 imposes a federal fee on the emission of greenhouse gases. Further, in January 2024 the Biden administration issued an executive order temporarily pausing approvals for pending and future applications to export LNG from new projects, due to, among other things, greenhouse gas emissions.
We are also subject to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended and similar laws which provide for responses to and liability for releases of hazardous substances into the environment. Additionally, the Clean Air Act, the Clean Water Act, the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Emergency Planning and Community Right to Know Act, each as amended, and similar foreign, state or local counterparts to these federal laws, regulate air emissions, water discharges, hazardous substances and wastes, and require public disclosure related to the use of various hazardous substances. Compliance with such environmental laws and regulations may require the acquisition of permits or other authorizations for certain activities and compliance with various standards or procedural requirements. We believe that our facilities are in substantial compliance with current regulatory standards.
In addition, our operations are subject to extensive government regulation by the U.S. Coast Guard, as well as various private industry organizations such as the American Petroleum Institute, American Society of Mechanical Engineers, American Welding Society and the American Bureau of Shipping.
8
Our compliance with these laws and regulations has entailed certain additional expenses and changes in operating procedures; however, we believe that compliance efforts have not resulted in a material adverse effect on our business or financial condition. Future events, such as changes in existing laws and regulations or their interpretation, more vigorous enforcement policies of regulatory agencies, or stricter or different interpretations of existing laws and regulations, may require additional expenditures by us. See “Risk Factors” in Item 1A for further discussion of government and environmental regulations impacting our business.
Insurance
We maintain insurance coverage for various aspects of our business and operations. However, we may be exposed to future losses due to coverage limitations and our use of deductibles and self-insured retentions for our exposures related to property and equipment damage, builder’s risk, third-party liability, and worker’ compensation and USL&H. In connection with our insurance coverage renewal for our property and equipment during 2023, we determined that the benefits of maintaining insurance coverage for our property and equipment were limited due to high premium costs and deductibles and increased coverage limitations. Accordingly, we did not renew all of our property and equipment coverage and are now generally self-insured for exposures resulting from any future damage to our property and equipment. See “Risk Factors” in Item 1A for further discussion of limitations of our insurance coverage.
Available Information
We make available our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to those reports, free of charge through our Internet website at www.gulfisland.com as soon as reasonably practicable after such materials are electronically filed with or furnished to the U.S. Securities and Exchange Commission (the “SEC”). The SEC also maintains an Internet website at www.sec.gov that contains periodic reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC. Our website and the information contained therein or connected thereto are not intended to be incorporated into this Report.
Item 1A. Risk Factors
The following discussion of risk factors contains forward-looking statements (see “Cautionary Statement on Forward-Looking Information”). These risk factors are important to understanding other statements in this Report. The following information should be read in conjunction with Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and Item 8 “Financial Statements and Supplementary Data” found elsewhere in this Report, which may include additional factors that could adversely affect our business. References to “Notes” relate to the Notes to our Consolidated Financial Statements (“Financial Statements”) in Item 8.
Our business, prospects, financial condition, operating results, cash flows, liquidity and stock price may be affected materially and adversely, in whole or in part, by a number of factors, whether currently known or unknown, including but not limited to those described below, any one or more of which could, directly or indirectly, cause our actual financial condition, operating results, liquidity and cash flows to vary materially from historical results or those anticipated, projected or assumed in our forward-looking statements. Further, new risks emerge from time to time. In addition, our business, prospects, financial condition, operating results, cash flows, liquidity and stock price could be affected by additional factors that apply to all companies generally which are not specifically mentioned below.
9
Business and Industry Risks
Our revenue and profitability continues to be dependent on the offshore oil and gas industry, which is a historically cyclical industry.
Our business continues to be significantly dependent on the level of capital expenditures by oil and gas producers, processors and their contractors, as well as alternative energy companies, operating in the GOM and along the Gulf Coast. The level of capital expenditures by these companies can be impacted by oil and gas and associated commodity prices. In recent years, the price of oil and gas has experienced significant volatility, which resulted in reductions in capital spending and drilling activities from our traditional offshore oil and gas customer base. Consequently, our operating results and cash flows were negatively impacted from reductions in revenue, lower margins due to competitive pricing, and under-utilization of our operating facilities and resources. Although oil and gas prices have recovered from the historic lows seen in 2020, due in part to geopolitical conflicts, there are no assurances that the increase in prices will be sustained or that our business will continue to benefit from such increase in prices.
In addition to commodity prices, the levels of our customers’ capital expenditures are influenced by, among other things:
We are unable to predict future oil and gas prices or the level of oil and gas industry activity for the services we provide. Further, the current relative stabilization in oil and gas prices and increase in bidding activity may not necessarily translate into long-term increased activity. Even during periods of relatively high oil and gas prices, our customers may cancel or curtail capital expenditure programs for exploration and production and repair and maintenance of their offshore assets due to uncertainty regarding oil and gas prices and other priorities for cash flows, including investment in energy transition projects. Advances in onshore exploration and development technologies, or energy transition projects, could result in our historical customers allocating a higher percentage of their capital expenditure budgets to such activities and we may not be successful securing new project awards related to these activities. See risk factor below titled “Our efforts to strategically reposition the Company to diversify our service offerings and customer base may not result in increased shareholder value.” In addition, an increase in gas prices could also negatively impact future investments in petrochemical and other facilities that benefit from lower gas prices. These factors could cause our revenue and margins to be depressed and limit our future growth opportunities. See Note 1 and “Overview” in Item 7 for further discussion of the impacts of oil and gas price volatility.
The impacts on our business of the volatility of oil and gas prices and other factors that have influenced our customers’ capital spending have included, or may continue to include, among other things, reduced bidding activity; suspension or termination of backlog; deterioration of customer financial condition; and unanticipated project costs and schedule delays due to supply chain disruptions, labor and material price increases, lower labor productivity, increased employee and contractor absenteeism and turnover, craft labor hiring challenges, increased safety incidents, lack of performance by subcontractors and suppliers, and contract disputes. For example, in February 2023, we received direction from our customer to suspend all activities on our offshore jackets project, and in July 2023, the customer cancelled the contract. See Note 2 and “New Project Awards and Backlog” in Item 7 for further discussion of the project cancellation.
10
We service industries that are highly competitive among service providers.
The onshore refining, petrochemical, LNG and industrial fabrication industries and the offshore oil and gas fabrication and services industry are highly competitive and influenced by events largely outside of our control. In addition, as we seek fabrication opportunities related to energy transition initiatives, including in support of our customers who are making energy transitions away from fossil fuels, opportunities related to offshore wind developments and potential future onshore support structures to provide electricity from renewable and green sources, we expect to face increased competition. Contracts for our fabrication and services projects are often awarded on a competitively bid basis, and our customers consider many factors when awarding a project. These factors include price, ability to meet the customer’s schedule, the availability and capacity of personnel, equipment and facilities, and the reputation, experience, and safety record of the contractor. We can provide no assurances that we will be able to maintain our current competitive position or that we will be able to successfully compete with other companies as the green energy transition progresses. In addition, we often compete with companies that have greater resources, which may make them more competitive for certain projects.
Competition with foreign fabricators can also be challenging as such competitors often have lower operating costs and lower wage rates, and foreign governments often use subsidies and incentives to create local jobs and impose import duties and fees on products. In addition, technological innovations have lowered transportation costs, increasing the competitiveness of foreign competitors when exporting structures from foreign locations to the GOM and Gulf Coast, which may hinder our ability to successfully secure new awards for projects destined for the GOM and Gulf Coast from foreign locations. See “Competition” in Item 1 for further discussion of the competitive nature of our industry.
A small number of customers may represent a significant portion of our revenue.
We derive a significant amount of our revenue from a small number of customers in any given year. For our Services Division, our services for such customers are generally subject to master services agreements, and accordingly, such customers tend to be consistent each year; however, the amount of revenue may vary between years because the level of services that we may provide depends on, among other things, the amount of that customer’s capital expenditure budget, our labor availability and our ability to meet the customer’s schedule requirements. For our Fabrication Division, our services for such customers are generally project specific, and accordingly, may account for a significant portion of our revenue in one year, but represent a smaller or even immaterial portion of our revenue in subsequent years, or vice-versa. We define significant customers as those that individually comprise 10% or more of our consolidated revenue. For 2023, we had two customers that accounted for 53% of our consolidated revenue (excluding the negative revenue charge associated with the resolution of our MPSV Litigation for our Shipyard Division), and for 2022, we had two customers that accounted for 48% of our consolidated revenue. The loss of a significant customer in any given year for any reason, including a sustained decline in that customer’s capital expenditure budget or competitive factors, could result in a substantial loss of revenue. See “Customers” in Item 1 for further discussion of our customers.
Competitive pricing common in the industries we serve could negatively impact our operating results.
We have not always been successful in fully recovering our project and overhead costs or realizing a profit, even when industry conditions are favorable, due in part to the competitive environment for new project awards. While we have recently experienced an increase in bidding activity for fabrication projects and demand for our services remains high, this trend may not continue. Additionally, as it relates to our fabrication business, during periods of increased market demand, new fabrication service capacity may enter the market, which could place additional pressure on the pricing of our fabrication projects. Furthermore, during periods of declining pricing for our fabrication projects and services, we may not be able to reduce our costs accordingly, which could impact our ability to compete.
Operational Risks
Our business depends on the award of new contracts and the timing and execution of those awards.
It is difficult to predict whether or when we will be awarded new contracts due to complex bidding and selection processes, changes in existing or forecast market conditions, governmental regulations, permitting and environmental matters. In the case of our Fabrication Division, while we have seen an increase in bidding activities, we can provide no assurances that the higher level of bidding activity will continue during 2024 and beyond or that we will be successful in securing any large project awards. Our results of operations and cash flows can fluctuate materially from period to period based on our success in securing new project awards.
11
Our short-term profitability may be affected from time to time as we balance our current capacity with expectations of future project awards and the timing of execution of new project awards. If an expected new project award is delayed or not received, or project execution is delayed subsequent to an award, we may incur costs to maintain an idle workforce and facilities, or alternatively, we may determine that our long-term interests are best served by reducing our workforce and incurring increased costs associated with termination benefits. For example, in February 2023, we received direction from our customer to suspend all activities on our offshore jackets project, and in July 2023, the customer cancelled the contract. See Note 2 and “New Project Awards and Backlog” in Item 7 for further discussion of the project cancellation. A reduction in our workforce could also impact our results of operations if customers are hesitant to award new contracts based upon our staffing levels or if we are unable to adequately increase our labor force and staff projects that are awarded following our workforce reductions over recent years. See the risk factor below titled “We may be unable to employ a sufficient number of skilled personnel to execute our projects” for further discussion of the impacts of labor constraints on our operations.
The nature of our contracting terms for our contracts could adversely affect our operating results.
A substantial number of our projects are performed on a fixed-price or unit-rate basis in any given year. Under fixed-price contracts, our contract price is fixed, and is generally only subject to adjustment for changes in scope by the customer. Accordingly, we retain cost savings realized on a project but are also responsible for cost overruns. Under unit-rate contracts, material items or labor tasks are assigned unit rates of measure. The unit rates of measure will generally be a reimbursable value per ton, per foot or square foot or per item installed. A typical unit-rate contract can contain hundreds to thousands of unit rates of measure. Profit margins are incorporated into the unit-rates and, similar to a fixed-price contract, we retain cost savings realized on a project but are also responsible for cost overruns. In many cases, our fixed-price and unit-rate contracts involve complex design and engineering, significant procurement of materials and equipment, and extensive project management. In addition, as projects increase or decrease in scope, the resulting changes in contract price or unit-rates could be less than the actual costs incurred associated with such changes in scope. We employ our best efforts to properly estimate the cost to complete our projects; however, our actual costs incurred could materially exceed our estimates. The revenue, costs and profit realized on a contract will often vary from the estimated amounts on which such contract was originally estimated due to the following:
These variations and risks are inherent within our industry and may result in revenue and profit that differ from amounts originally estimated or result in losses on projects. Depending on the size and duration of a project, variations from estimated contract performance can have a significant impact on our operating results. In addition, substantially all of our contracts require us to continue work in accordance with the contractually agreed schedule, and thus, continue to incur expenses for labor and materials, notwithstanding the occurrence of a disagreement with a customer over changes in scope, increased pricing and/or unresolved change orders or claims.
12
We could be exposed to potentially significant liability and costs due to limits on our insurance coverage and losses for which we do not have third-party insurance coverage.
The fabrication of structures and the services we provide involves operating hazards that can cause accidents, resulting in personal injury or loss of life, severe damage to and destruction of property and equipment, and suspension of operations.
In addition, due to the proximity to the GOM, our facilities are subject to the possibility of physical damage caused by hurricanes or flooding. For example, in 2021, Hurricane Ida damaged our buildings, equipment and vessels under construction and in our possession, at our Houma Facilities, which resulted in repair and replacement costs in excess of our deductible amounts. See the risk factor below titled “We are susceptible to adverse weather conditions in our market areas” for further discussion of the impacts of adverse weather conditions to our operations.
Further, our employees may engage in certain activities that are covered by the provisions of the Jones Act or USL&H, including services conducted on offshore platforms, services performed on barges owned or chartered by us, and fabrication activities that are performed at our Houma Facilities. These laws make the liability limits established under state workers’ compensation laws inapplicable to these employees and, instead, permit them or their representatives to pursue actions against us for damages or job-related injuries, with generally no limitations on our potential liability. Our ownership and operation of vessels can also give rise to large and varied liability risks, such as risks of collisions with other vessels or structures, sinking, fires and other marine casualties, which can result in significant claims for damages against both us and third parties. Litigation arising from any such occurrences may result in our being named as a defendant in lawsuits asserting large claims.
We may be exposed to future losses through our use of deductibles and self-insured retentions for our exposures related to property and equipment damage, builder’s risk, third-party liability and workers’ compensation and USL&H claims. For any such exposures, we will rely on existing liquidity and cash flows to meet obligations that would arise from an incident or series of events. The occurrence of a significant incident, series of events, or unforeseen liability for which we are self-insured or not fully insured, or for which insurance recovery is significantly delayed, could have a material adverse effect on our results of operations or financial condition.
There can be no assurance that we will be able to maintain adequate insurance at rates we consider reasonable or that our insurance coverages will be adequate to cover claims that may arise. Changes in the insurance industry have generally led to higher insurance costs and decreased availability of coverage. The availability of insurance that covers risks we typically insure against may decrease, and the insurance that we are able to obtain may have higher deductibles, higher premiums and more restrictive policy terms. In connection with our insurance coverage renewal for our property and equipment during 2023, we determined that the benefits of maintaining insurance coverage for our property and equipment were limited due to high premium costs and deductibles and increased coverage limitations. Accordingly, we did not renew all of our property and equipment coverage and are now generally self-insured for exposures resulting from any future damage to our property and equipment. To the extent we are self-insured, reserves are recorded based upon our estimates, with input from legal and insurance advisors. Changes in assumptions, as well as changes in actual experience, could cause these estimates to change. See Note 7 for further discussion of our insurance coverages.
Our backlog is subject to change as a result of delay, suspension, termination or an increase or decrease in scope for projects currently in backlog.
The revenue projected in our backlog may not be realized or, if realized, may not be profitable. Projects included in our backlog are generally subject to delay, suspension, termination, or an increase or decrease in scope at the option of the customer. Depending on the size of the project, the delay, suspension, termination, increase or decrease in scope of any project could significantly impact our backlog and change the expected amount and timing of revenue recognized. For example, in February 2023, we received direction from our customer to suspend all activities on our offshore jackets project, and in July 2023, the customer cancelled the contract. In addition, whether a project proceeds as scheduled, is suspended or terminated, it is possible that the customer may default by failing to pay amounts owed to us, including reimbursement to us for third-party costs we have committed or incurred on the customer’s behalf. Accordingly, our backlog as of any date is an uncertain indicator of future results of operations. See Note 2 and “New Project Awards and Backlog” in Item 7 for further discussion of our new project awards and backlog and the project cancellation.
13
Our project execution and operations may be negatively affected if our equipment is not operable or does not adequately function.
Our project execution and operations are heavily dependent on the use of owned and leased equipment. Accordingly, equipment that is not operable or that does not adequately function could negatively impact our project execution and operations. As our equipment ages, the costs associated with maintaining such equipment typically increases, and in some instances, such equipment may require full replacement. In recent years we have not made significant investments in new equipment or the refurbishment of owned equipment, and accordingly, future repair or replacement costs could be significantly higher than those recently experienced. Further, equipment that becomes non-operable or that does not properly function may result in the temporary suspension of our operations until the equipment is repaired or replaced, and such impacts may be compounded by limitations on the availability and timely receipt of replacement equipment or component parts. See the risk factor below titled “We depend on third parties to provide services and supply raw materials, equipment and components necessary to perform our contractual obligations, and any increase in the price or constraints on the supply of such raw materials, equipment or components could negatively affect our profitability” for discussion of the availability of equipment and component parts.
We depend on third parties to provide services and supply raw materials, equipment and components necessary to perform our contractual obligations, and any increase in the price or constraints on the supply of such raw materials, equipment or components could negatively affect our profitability.
The price and availability of the raw materials required to execute our projects are subject to volatility and disruptions caused by global economic factors that are beyond our control, including, but not limited to, supply chain disruptions, labor shortages, wage pressures, rising inflation and potential economic slowdown or recession, increases in fuel and energy costs, the impact of natural disasters, public health crises, geopolitical conflicts, foreign currency exchange rate fluctuations, and other matters that have or could impact the global economy.
We rely on third parties to provide raw materials, equipment and components, and depend upon subcontractors for a variety of reasons, including performing work we would otherwise perform with our employees but are unable to do so as a result of scheduling demands, performing certain aspects of a contract more efficiently considering the conditions of the contract, and performing certain services that we are unable to do or which we believe can be performed at a lower cost by subcontractors. During 2023, supplier and subcontractor delays negatively affected our completion of the Ferry Projects, which prolonged the wind down of our Shipyard Division operations and resulted in further losses on the projects. See Note 2 for further discussion of the impacts of supplier and subcontractor delays on our projects.
Ensuring continuity of supply of such raw materials to our operations is critical to our business. We also rely on the availability of equipment and components for key equipment from our suppliers, which may be impacted by competition demands as well as the availability of input materials in the creation of such equipment and components for key equipment. Failure of suppliers and subcontractors to deliver raw materials, equipment and components and provide services, or perform under their contracts on a timely basis, or at all, has had and may continue to have an adverse impact on our operations. The impact of global macroeconomics on our suppliers and subcontractors has resulted in, and may continue to result in, scheduling delays and higher costs, including as a result of inflation, for subcontracted services and raw materials, equipment and components. Further, there continue to be global shipping and logistics challenges, which began during the COVID-19 pandemic.
A supplier’s failure to supply raw materials, equipment or components in a timely manner or to meet our quality, quantity or cost requirements or technical specifications, or our inability to obtain alternative sources of raw materials, equipment or components on a timely basis or on terms acceptable to us, could adversely affect our operations. The inability of our suppliers or subcontractors to perform could result in the need to transition to alternative suppliers or subcontractors, which could result in significant incremental costs and delay, or the need for us to provide other supplemental means to support our existing suppliers and subcontractors. Disruptions and performance problems caused by our suppliers and subcontractors, or a misalignment between our contractual obligations to our customers and our agreements with our subcontractors and suppliers, could have an adverse effect on our ability to meet our commitments to customers.
We may be protected from increases in material costs through cost escalation provisions in some of our contracts. However, the difference between our actual material costs and these escalation provisions may expose us to cost uncertainty. In addition, we may experience significant delays in deliveries of key raw materials, which may occur as a result of availability or price, including higher costs due to inflation. During 2023, delays and shortages of raw materials, equipment and components negatively affected our completion of the Ferry Projects, which prolonged the wind down of our Shipyard Division operations and resulted in further losses on the projects. Delays and shortages of raw materials, equipment and components could continue in 2024, which may have an impact on other projects. See Note 2 for further discussion of the impacts of material delays on our projects.
14
We may be unable to successfully defend against claims made against us by customers, subcontractors or other parties, or recover claims made by us against customers, subcontractors or other parties.
We are, and may in the future become, involved in various legal proceedings and subject to other contingencies that have arisen or may arise in the ordinary course of our business. Our projects are generally complex, and we may encounter difficulties in design, engineering, schedule changes and other factors, some of which may be beyond our control, that affect our ability to complete projects in accordance with contractual delivery dates or to otherwise meet contractual performance obligations.
We may bring claims against customers for additional costs incurred by us resulting from customer-caused delays or changes in project scope initiated by our customers that are not part of the original contract scope. In addition, claims may be brought against us by customers relating to, among other things, alleged defective or incomplete work, breaches of warranty and/or late completion of work. We may also have disputes with our subcontractors and other parties, related to, among other things, indemnification obligations. These claims may be subject to lengthy and/or expensive litigation or arbitration proceedings and may require us to invest significant working capital in projects to cover cost increases pending resolution of the claims. The outcome of litigation is inherently uncertain and adverse developments or outcomes can result in significant monetary damages, penalties, other sanctions or injunctive relief against us, limitations on our property rights, or regulatory interpretations that increase our operating costs. A material adverse outcome in any uninsured litigation could result in our liabilities exceeding our assets. See Note 2 for discussion of our ongoing customer disputes.
Regardless of the merit of particular claims, defending against litigation or responding to investigations can be expensive, time-consuming, disruptive to our operations and distracting to management. In recognition of these considerations, we may enter into agreements or other arrangements to settle litigation and resolve such challenges. There can be no assurance such agreements can be obtained on acceptable terms or that litigation will not occur or that we will not incur charges resulting from any such agreements or settlements.
Systems and information technology interruption or failure and data security breaches could adversely impact our ability to operate or expose us to significant financial losses and reputational harm.
We rely heavily on computer information, communications technology and related systems in order to properly operate our business. From time to time, we experience occasional system interruptions and delays. In the event we are unable to deploy software and hardware, effectively upgrade our systems and network infrastructure, and take other steps to maintain or improve the efficiency and efficacy of our systems, the operation of such systems could be interrupted or result in the loss, corruption or release of data. In addition, our computer and communications systems and operations could be damaged or interrupted by natural disasters, force majeure events, telecommunications failures, power loss, acts of war or terrorism, physical or electronic security breaches, intentional or inadvertent user misuse or error, or similar events or disruptions. Any of these or other events could cause interruptions, delays, loss of critical and/or sensitive data or similar effects.
In addition, we face the threat to our computer systems of unauthorized access, computer hackers, computer viruses, malicious code, organized cyber-attacks and other security problems and system disruptions. If we were to be subject to a cyber incident or attack, it could result in the disclosure of confidential or proprietary customer information, theft, loss, corruption or misappropriation of intellectual property, damage to our reputation with our customers and the market, failure to meet customer requirements or customer dissatisfaction, theft, exposure to litigation, damage to equipment and other financial costs and losses. We rely on industry accepted security measures and technology to securely maintain all confidential and proprietary information on our computer systems, but these systems are still vulnerable to such threats. In addition, as cybersecurity threats continue to evolve, we may be required to expend significant resources to protect against the threat of these system disruptions and security breaches or to alleviate problems caused by these disruptions and breaches. See “Cybersecurity” in Item 1C for further discussion of our cybersecurity governance, risk management and strategy.
We may conduct a portion of our operations through joint ventures and strategic alliances over which we may have limited control, and our partners in such arrangements may not perform.
We may conduct a portion of our operations through joint ventures and strategic alliances with business partners. In any such arrangement, differences in views among the participants may result in delayed decisions or in failures to reach agreement on certain matters, or to do so in a timely manner. In any joint venture or strategic alliance in which we hold a non-controlling interest, we may have limited control over many decisions relating to joint venture operations and internal controls relating to operations. We also cannot control the actions of our partners, including any non-performance, default, or bankruptcy of our partners, and we would likely share liability or have joint and/or several liability with our partners for joint venture matters.
15
Major public health crises may have a negative impact on our operations.
Pandemics, epidemics, widespread illness or other health crises, that interfere with the ability of our employees, suppliers, customers, financing sources or others to conduct business have and could adversely affect the global economy and our operations and business, including our backlog and bidding activities. See the risk factors above titled “Our revenue and profitability continues to be dependent on the offshore oil and gas industry, which is a historically cyclical industry” and “We depend on third parties to provide services and supply raw materials, equipment and components necessary to perform our contractual obligations, and any increase in the price or constraints on the supply of such raw materials, equipment or components could negatively affect our profitability” for further discussion of the impacts of major public health crises on our operations.
Our business and results of operations could be adversely affected if significant portions of our workforce are unable to work effectively, including because of illness, quarantines, government actions or other restrictions. For example, our operations (as well as the operations of our customers, subcontractors and other counterparties) were previously negatively impacted by the physical distancing, quarantine and isolation measures recommended by national, state and local authorities on large portions of the population, and mandatory business closures that were enacted in an attempt to control the spread of COVID-19, and which could be reenacted in response to any future major public health crisis (including any new and emerging strains and variants of COVID-19).
Financial Risks
We may need additional capital in the future for working capital, capital expenditures, contract commitments and/or acquisitions, and we may not be able to obtain or raise such capital (whether debt or equity) or do so on favorable terms, which would impair our ability to operate our business or execute our strategy.
Our primary sources of liquidity are our cash, cash equivalents and scheduled maturities of short-term investments. If such amounts and cash flows from operating activities are not sufficient to fund our working capital requirements, capital expenditures, contract commitments and obligations, and/or acquisition opportunities, we would be required to reduce our capital expenditures and/or forego certain contracts and/or acquisition opportunities, or we would be required to fund such needs through debt or equity issuances or through other financing alternatives, including the sale of assets. See risk factor below titled “We may not be able to obtain letters of credit or surety bonds if and when needed on favorable terms, if at all, and we may not have sufficient liquidity to satisfy any indemnification obligations owed to a surety should the surety have to make payments under the performance bonds to the beneficiary thereof” for further discussion of the impacts that potential indemnification obligations may have on our liquidity.
We may be required to make capital investments in our existing or new facilities and increase our working capital to support our backlog or new project awards. The capital outlays and working capital required by us to execute such projects could exceed our existing cash, cash equivalents, scheduled maturities of short-term investments and cash flows from operating activities, and we may not be able to obtain debt financing or credit facilities to fund any such capital investment or working capital requirements.
Our ability to successfully obtain debt financing or credit facilities or raise equity capital in the future will depend in part upon prevailing capital market conditions, as well as conditions in our business and our operating results, and those factors may affect our efforts to obtain additional capital on terms that are satisfactory to us. There are a number of potential negative consequences for the energy sector that may result if oil and gas prices become volatile or decline or if oil and gas companies continue to de-prioritize investments in exploration, development and production, including the continued or worsening of outflow of credit and capital from the energy sector and/or energy focused companies and further efforts by lenders to reduce their exposure to the energy sector, including the imposition of increased lending standards for the energy sector, higher borrowing costs and collateral requirements, or a refusal to extend new credit or amend existing credit facilities in the energy sector. These potential negative consequences may be exacerbated by the pressure exerted on financial institutions by regulatory agencies to respond quickly and decisively to credit risk that develops in distressed industries. All of these factors may complicate our ability to achieve a favorable outcome in obtaining debt financing or credit facilities.
In order to secure debt financing or credit facilities with borrowing capacity, if available, we may be required to provide significant collateral, pay high interest rates and otherwise agree to restrictive terms. Collateral requirements and higher borrowing costs may limit our long- and short-term financial flexibility, and any failure to secure debt financing or credit facilities on terms that are acceptable to us could jeopardize our ability to fund, among other things, capital expenditures and general working capital needs or meet our other financial commitments. For example, in connection with the resolution of our MPSV Litigation on October 4, 2023, we entered into a promissory note (“Note Agreement”) and amended the multiple indebtedness mortgage (“Mortgage Agreement”) with one of our Sureties to secure our obligations under the Note Agreement and under our general indemnity agreement with such Surety associated with its outstanding surety bonds for our forty-vehicle ferry projects. See Note 4 and “Liquidity and Capital Resources” in Item 7 for further discussion of the Note Agreement and Mortgage Agreement.
16
If adequate capital is not available, or not available on beneficial terms, we may not be able to make future investments, take advantage of acquisitions or other investment opportunities, or respond to competitive challenges. This could limit our ability to bid on new project opportunities, thereby limiting our potential growth and profitability.
We may not be able to generate sufficient cash flow to meet our obligations.
Our ability to fund operations depends on our ability to generate future cash flows from operations. This, to a large extent, is subject to conditions in the oil and gas industry, including commodity prices, demand for our services and the prices we are able to charge for our services, general economic and financial conditions, competition in the markets in which we operate, the impact of legislative and regulatory actions on how we conduct our business and other factors, all of which are beyond our control. During 2022, we experienced negative cash flows from operations, which could occur again if global macroeconomic conditions were to worsen or oil and gas prices decline significantly resulting in delayed or suspended capital expenditures by customers, or if we were to experience losses on our projects. See “Liquidity and Capital Resources” in Item 7 for further discussion of our business outlook.
On April 17, 2020, we entered into an unsecured loan in the aggregate amount of $10.0 million (“PPP Loan”) with Whitney Bank pursuant to the Paycheck Protection Program under the Coronavirus Aid, Relief, and Economic Security Act, as amended. An aggregate principal amount of $8.9 million of the PPP Loan was forgiven and we repaid the remaining outstanding balance of $1.1 million in July 2021. Because the amount borrowed exceeded $2.0 million, we are required by the Small Business Administration (“SBA”) to retain all records relating to the PPP Loan for six years from the date the loan was forgiven and permit authorized representatives of the SBA to access such records upon request. While we believe we are a qualifying business and have met the eligibility requirements of the PPP Loan, and believe we have used the loan proceeds only for expenses which may be paid using proceeds from the PPP Loan, we can provide no assurances that any potential SBA review or audit will verify the amount forgiven, in whole or in part. If we are later determined to have been ineligible to receive the PPP Loan or loan forgiveness, we may be subject to significant penalties, including significant civil, criminal and administrative penalties, and we could be required to repay the PPP Loan in its entirety, which could negatively impact our liquidity, and have an adverse impact on our reputation.
We may not be able to obtain letters of credit or surety bonds if and when needed on favorable terms, if at all, and we may not have sufficient liquidity to satisfy any indemnification obligations owed to a surety should the surety have to make payments under the performance bonds to the beneficiary thereof.
Certain of our projects require that we issue letters of credit or surety bonds to our customers in order to secure advance payments or guarantee performance under our contracts. Our LC Facility currently provides for letters of credit, which are subject to cash securitization. With respect to letters of credit under our LC Facility, any advance in the event of non-performance under a contract would become a direct obligation and reduction in our cash. With respect to surety bonds, payments by the Surety pursuant to a bond in the event of non-performance are subject to reimbursement to the Surety by us under a general indemnity agreement. Such indemnification obligations may include the face amount of the surety bond, or portions thereof, as well as other reimbursable items such as interest and certain investigative expenses and legal fees of the Surety. Such indemnification obligations would require us to use our cash, cash equivalents or short-term investments, and we may not have sufficient liquidity to satisfy such indemnification obligations. When a contract is complete, the contingent obligation terminates, and letters of credit or surety bonds are returned. It has been increasingly difficult to obtain letters of credit and bonding capacity and identify potential financing sources, due to, among other things, losses from our operations in recent years, including charges on projects within our Shipyard Division and discontinued operations. We can provide no assurances that necessary letters of credit or bonding capacity will be available to support future project requirements or that we will have sufficient liquidity to satisfy any future indemnification obligations. See Note 4 and “Liquidity and Capital Resources” in Item 7 for further discussion of our LC Facility and surety bonds.
We are exposed to the credit risks of our customers, including nonpayment and nonperformance by our customers.
The oil and gas industry continues to face significant challenges due to the prolonged period of depressed and/or volatile oil and gas prices from 2014 to 2018 and subsequent volatility in oil and gas prices. The concentration of our customers in the oil and gas industry may impact our overall exposure to credit risk as customers may be similarly affected by negative changes in industry conditions. We believe certain of our customers finance their activities through cash flows from operations and debt or equity financing. Many of these customers have faced significant challenges since 2008 due to the volatility in the price of oil and gas, including decreased cash flows, reductions in borrowing capacity, the inability to access capital or credit markets, and reductions in liquidity. While the prices of oil and gas have somewhat stabilized recently, the duration of such stability is uncertain and difficult to predict. If the price of oil and gas significantly declined or the returns on capital investments by our customers are insufficient, our operations could be impacted due to nonpayment or nonperformance by our customers. We perform ongoing credit evaluations of our customers and do not generally require collateral in support of our trade receivables. While we maintain reserves for potential credit losses, we can provide no assurances that such reserves will be sufficient to cover uncollectible receivable amounts or that our losses from such receivables will be consistent with our expectations. See Note 2 for further discussion of our reserves for potential credit losses.
17
Furthermore, some of our customers may be highly leveraged and subject to their own operating and regulatory risks, which increases the risk that they may default on their obligations to us. To the extent one or more of our key customers is in financial distress or commences bankruptcy proceedings, contracts with, or obligations from, these customers may be subject to renegotiation or rejection under applicable provisions of the U.S. Bankruptcy Code and similar international laws.
Our method of accounting for revenue using the percentage-of-completion method could have a negative impact on our results of operations.
Revenue and gross profit for contracts accounted for using the percentage-of-completion method can be significantly affected by changes in estimated cost to complete such contracts. Significant estimates impacting the cost to complete a contract include: forecast costs of engineering, materials, equipment and subcontracts; forecast costs of labor and labor productivity; schedule durations, including subcontractor and supplier progress; contract disputes, including claims; achievement of contractual performance requirements; and contingency, among others. The cumulative impact of revisions in total cost estimates during the progress of work is reflected in the period in which these changes become known, including, to the extent required, the reversal of profit recognized in prior periods and the recognition of losses expected to be incurred on contracts. Due to the various estimates inherent in our contract accounting, actual results could differ from those estimates, which could result in material changes to our Financial Statements and related disclosures.
Further, our time and materials (“T&M”), cost-reimbursable and unit-rate contracts generally have more variability in the scope of work than fixed-price contracts and provide our customers with greater influence over the timing of when we perform our work. Accordingly, such contracts often result in less predictability with respect to the timing of when our revenue is recognized. See Notes 1 and 2 and “Critical Accounting Policies” in Item 7 for further discussion of our contracting and revenue recognition.
Disruptions at the regional bank in which we deposit our funds could have an adverse impact on our business and financial condition.
We hold substantially all of our cash deposits with a single regional bank and we rely on our deposits with the bank to fund our operations. Any disruption in the bank’s ability to process payments or maintain our deposits would significantly disrupt our business and could materially affect our operations. In addition, we currently have cash and cash equivalents deposited in excess of federally insured levels with the bank, and if the bank were to fail, we could lose our deposits in excess of insured levels. During 2023, federal governmental agencies took action to protect uninsured deposits at certain U.S. banks; however, if the regional bank in which we hold funds for operations were to fail, we cannot provide any assurances that such governmental agencies will take similar actions.
Workforce Risks
We may be unable to employ a sufficient number of skilled personnel to execute our projects.
Our productivity and profitability are significantly dependent upon our ability to attract and retain skilled construction supervision and craft labor, primarily welders, pipe fitters and equipment operators. The fabrication and services industries have lost a significant number of experienced professionals over the years due to the aging of the workforce and the cyclical nature of the oil and gas industry, which is attributable, among other reasons, to the volatility of oil and gas prices and a more generalized concern about the overall future prospects of the oil and gas industry. See risk factor above titled “Our revenue and profitability continues to be dependent on the offshore oil and gas industry, which is a historically cyclical industry.” Many companies, including us, have reduced their skilled workforce in response to decreases in utilization. However, with the current oil and gas prices, we continue to experience an increase in bidding activity. The current competitive labor market may make it more difficult to increase our labor force to desirable levels if we realize a significant increase in our new project awards or backlog. We cannot be certain that we will be able to attract and retain the qualified labor force required to meet current or future needs at a reasonable cost, or at all.
With the recent increased demand for construction and services labor, the supply of skilled labor has become increasingly limited resulting in higher costs of labor, including increases in wage rates and the costs of recruiting or training to attract and retain qualified personnel, which could have a materially adverse impact on our business, financial condition and results of operations. Further, due to the higher demand for our services, if we cannot employ the necessary skilled labor to execute our backlog, we have had, and may have to continue, to increase our use of contract labor, which may have a higher cost and lower levels of productivity.
If we are unable to hire and retain necessary skilled labor, we may be unable to secure new project awards, execute our backlog and expand our operations. Further, any shortage of skilled labor or ongoing challenges hiring and retaining skilled labor could negatively affect the quality, safety, timeliness and profitability of our projects.
18
Our success is dependent on key personnel.
Our success is dependent upon the abilities of our executives, management, and other key employees who have significant and relevant industry experience. Our success also depends on our ability to attract, retain and motivate highly-skilled personnel in various areas, including construction supervision, project management, procurement, project controls and finance. The loss of one or more key personnel or our inability to attract, retain and motivate necessary personnel could impact our operations.
If we continue to have insufficient utilization levels for our facilities or personnel, our results of operations and financial condition would be adversely affected.
In recent years we have experienced an under-utilization of our facilities and personnel and have not fully recovered our overhead costs, due in part to the high fixed costs of our operations. This has resulted in losses from our operations in certain periods. If current or future facility and personnel capacity fails to match current or future customer demands for our services, our facilities would continue to be under-utilized, which could result in less profitable operations or ongoing losses from our operations.
Our employees and subcontractors work on projects that are inherently dangerous. If we fail to maintain safe work sites, we can be exposed to significant financial losses and reputational harm.
We work on projects with large, mechanized equipment, moving vehicles, and dangerous processes, which can place our employees and subcontractors in challenging environments. We maintain a safety assurance program designed to ensure the safety of our employees and subcontractors and to ensure that we remain in compliance with all applicable federal and state mandated safety regulations. If our safety assurance program fails, our employees, subcontractors and others may become injured, disabled or lose their lives, and our projects may be delayed, causing exposure to litigation or investigations by regulators.
Unsafe conditions at project work sites also have the potential to increase employee turnover, increase project costs and increase our operating costs. In addition, our customers often require that we meet certain safety criteria to be eligible to bid contracts. Our failure to maintain adequate safety standards could result in lost project awards and customers or preclude us from tendering future bids.
Strategic Risks
Our efforts to strategically reposition the Company to diversify our service offerings and customer base may not result in increased shareholder value.
Our operations have historically been focused on fabrication and services for the offshore oil and gas industry. We have begun to diversify our business through the pursuit of onshore fabrication opportunities and sustainable energy and other projects that are not related to our traditional offshore oil and gas markets. While the Shipyard Transaction resulted in a less diversified business portfolio such that we have a greater dependency on the performance of our remaining operations for our financial results, during 2021, we expanded our offshore services offerings and further diversified our offshore customer base through the acquisition of a services and industrial staffing business. In addition, during 2022, we made capital and other investments to expand our offshore services offering to include welding enclosures, which provides a safe environment for welding, cutting and burning without the need to shut down operations. Entry into, or further development of, new lines of business may expose us to risks that are different from those we have experienced historically. We may not be able to effectively manage these additional risks or implement successful business strategies and our cash flows derived from any new lines of business may not be consistent with our expectations or be insufficient to fully recover our investment. Additionally, our competitors in these expanded lines of business may possess greater operational knowledge, resources and experience than we do. These diversification initiatives may not increase shareholder value and could result in a reduction in shareholder value depending upon our required capital investment and success.
19
Any future rationalization of under-utilized assets or facilities to improve our asset or facility utilization could result in future losses or impairments and may not produce our desired results.
We may take actions to relocate assets, consolidate operations and rationalize under-utilized assets and facilities to improve our utilization. Such actions may include the sale of assets or the closure or consolidation of one or more of our facilities and the termination of facility employees. During 2023, we further consolidated our fabrication operations within our Houma Facilities, and in February 2024, we sold certain property of our Fabrication Division that was part of our Houma Facilities that was no longer deemed necessary for such operations. The property sold was classified as an asset held for sale (“Houma AHFS”) on our Balance Sheet at December 31, 2023. Further, during 2022, we sold a purchase option entered into in connection with a previous acquisition. A future sale of assets or facility closure or consolidation could result in impairments of facility assets and other restructuring or exits costs, including retention, severance or other costs associated with terminated personnel. Further, we can provide no assurances that any asset sales or facility closure or consolidation will result in an improvement in our overall utilization or that the costs of doing so will not exceed the benefits expected to be gained from the asset sales or closure or consolidation of a facility. In addition, any decisions made regarding our deployment or use of any sales proceeds we receive involves risks and uncertainties. As a result, our decisions with respect to such proceeds may not lead to increased long-term shareholder value. See Note 3 for further discussion of our Houma AHFS and the sale of the purchase option.
We cannot guarantee that our share repurchase program will enhance shareholder value, and share repurchases could affect the price of our common stock.
In December 2023, our Board of Directors (“Board”) authorized the repurchase of up to $5.0 million of our outstanding common stock from time to time through a share repurchase program (“Share Repurchase Program”). Under our Share Repurchase Program, we may make repurchases of stock through transactions in the open market, in privately negotiated transactions or by other means in accordance with applicable laws. The timing and amount of any share repurchases will be at the discretion of management and will depend on a variety of factors, including capital availability, our financial results, cash requirements, business, market, industry and global economic conditions, changes in laws, contractual restrictions and other factors deemed relevant by management. The Share Repurchase Program expires on December 15, 2024, does not obligate us to repurchase any shares and may be modified, increased, suspended or terminated at any time at the discretion of the Board. A suspension or termination of our share repurchases could have a negative effect on the price of our common stock. In addition, as part of the Inflation Reduction Act of 2022, the U.S. implemented a 1% excise tax on the value of certain stock repurchases by publicly traded companies. This tax could increase the costs to us of any share repurchases.
There are a number of ways in which the Share Repurchase Program could fail to result in enhanced shareholder value. For example, any failure to repurchase stock after we have announced our intention to do so may negatively impact our stock price. The existence of the share repurchase program could also cause our stock price to trade higher than it otherwise would and could potentially reduce the market liquidity for our stock. The market price of our common stock could decline below the levels at which we repurchased shares and short-term stock price fluctuations could reduce the effectiveness of the program.
Additionally, repurchasing our common stock will reduce the amount of cash and cash equivalents we have available to fund working capital, capital expenditures, capital preserving investments, strategic acquisitions or business opportunities, and other general corporate purposes, and there are no guarantees that the share repurchase program will result in increased shareholder value. See Note 8 and Item 5 for further discussion of our Share Repurchase Program.
Legal, Regulatory and Environmental Risks
Any changes in U.S. trade policies and retaliatory responses from other countries may significantly increase the costs or limit supplies of materials and products used in our fabrication projects.
In the past few years, the federal government has imposed new or increased tariffs or duties on an array of imported materials and products used in connection with our fabrication business, which raised our costs for these items (or products made with them), and threatened to impose further tariffs, duties and/or trade restrictions on imports. Foreign governments, including China and Canada, and trading blocs, such as the European Union, responded by imposing or increasing tariffs, duties and/or trade restrictions on U.S. goods. For example, in response to Russia’s invasion of Ukraine, the U.S. and other countries have imposed sanctions and/or other restrictive actions against Russia. These developments caused global economic disruptions, including increases in energy prices and the related European energy crisis. Any trading conflicts and related escalating governmental actions that result in additional tariffs, duties and/or trade restrictions could increase our costs, cause disruptions or shortages in our supply chains and/or negatively impact the U.S., regional or local economies.
20
We are susceptible to adverse weather conditions in our market areas.
Our operations may be subject to seasonal variations due to weather conditions and daylight hours, and to the extent climate change results in an increase in extreme adverse weather conditions, the likelihood of a negative impact on our operations may increase. Although we have large covered fabrication facilities, a significant amount of our fabrication activities continues to take place outdoors, and accordingly, the number of labor hours worked may decline during the winter months due to unfavorable weather conditions and a decrease in daylight hours. In addition, the seasonality of oil and gas industry activity in the GOM also affects our operations. Our offshore oil and gas customers often schedule the completion of their projects during the summer months in order to take advantage of more favorable weather during such months. Further, rainy weather, tropical storms, hurricanes and other storms prevalent in the GOM and along the Gulf Coast may also affect our operations. For example, in 2021, we experienced damage to our Houma Facilities due to Hurricane Ida, which made landfall as high-end Category 4 hurricane. Beyond financial and regulatory impacts, climate change poses potential physical risks. Scientific studies forecast that these risks include increases in sea levels, stresses on water supply, rising average temperatures and other changes in weather conditions, such as increases in precipitation and extreme weather events, such as floods, heat waves, hurricanes and other tropical storms and cyclones. The projected physical effects of climate change have the potential to directly affect the operations we conduct for customers and result in increased costs related to our operations. However, because the nature and timing of changes in extreme weather events (such as increased frequency, duration, and severity) are uncertain, it is not possible for us to estimate reliably the future financial risk to our operations caused by these potential physical risks. The impact of severe weather conditions or natural disasters has included and may continue to include the disruption of our workforce; curtailment of services; weather-related damage to our facilities and equipment for which we are generally self-insured, including impacts from infrastructure challenges in the surrounding areas, resulting in suspension of operations; inability to deliver equipment, personnel and products to project sites in accordance with contract schedules; and loss of productivity. Our suppliers and subcontractors are also subject to severe weather and natural or environmental disasters that have in the past and could in the future affect their ability to deliver products or services or otherwise perform under their contracts. Furthermore, our customers’ operations have been and in the future may be materially and adversely affected by severe weather and seasonal weather conditions, resulting in reduced demand for our services. See Note 2 and “Overview” in Item 7 for further discussion of the impacts of adverse weather conditions to our operations and the risk factor above titled “We could be exposed to potentially significant liability and costs due to limits on our insurance coverage and losses for which we do not have third-party insurance coverage.”
The nature of the industries that we serve subjects us to compliance with regulatory and environmental laws.
Our operations and properties are subject to a wide variety of existing foreign, federal, state and local laws and other regulations. See “Government and Environmental Regulation” in Item 1 for further discussion. Compliance with many of these laws is becoming increasingly complex, stringent and expensive. These laws may impose “strict liability” for damages to natural resources or threats to public health and safety, rendering a party liable for the environmental damage without regard to its negligence or fault. Certain environmental laws provide for strict, joint and several liability for remediation of spills and other releases of hazardous substances, as well as damage to natural resources. In addition, we could be subject to claims alleging personal injury or property damage as a result of alleged exposure to hazardous substances. Such laws and regulations may also expose us to liability for the conduct of others or conditions caused by others, or acts for which we were in compliance with applicable laws at the time such acts were performed. To date, compliance with such laws has not resulted in a material adverse effect on our operations. However, we cannot predict when and whether any new or additional regulations may become effective, such as the regulatory response to climate change, and what their effect will be on us or our customers.
The demand for our services may be impacted by the regulatory response to climate change. Due to concern over the risk of climate change, several countries have adopted, or are considering the adoption of, regulatory frameworks to reduce the emission of carbon dioxide, methane and other gases (greenhouse gas emissions). These regulations include adoption of cap and trade regimes, carbon taxes, restrictive permitting, increased efficiency standards, and incentives or mandates for renewable energy. For example, the Inflation Reduction Act of 2022 imposes a federal fee on the emission of greenhouse gases. Existing and future regulatory response to climate change may potentially result in delays or prevent customers’ projects from going forward and could adversely affect demand for the oil and natural gas that some of our customers produce, thereby potentially limiting demand for our services. The demand for our services is also affected by changing taxes, price controls and other laws and regulations related to the oil and gas, chemicals, commodities and alternative energy industries. We may not be able to pass any resulting cost increases on to our customers.
Offshore construction and drilling in certain areas is opposed by many environmental groups and, in certain areas, has been restricted. To the extent laws are enacted or other governmental actions are taken that prohibit or restrict offshore construction and drilling or impose environmental protection requirements that result in increased costs to the oil and gas industry in general and the offshore construction industry, our business and prospects could be adversely affected. We cannot determine to what extent future operations and results of operations may be affected by new legislation, new regulations or changes in existing regulations.
21
Actions of activist shareholders could create uncertainty about our future strategic direction, be costly and divert the attention of our management and board. In addition, some institutional investors may be discouraged from investing in the industries that we service.
In recent years, activist shareholders have placed increasing pressure on publicly-traded companies to effect changes to corporate governance practices, executive compensation practices or social and environmental practices, or to undertake certain corporate actions or reorganizations. Responding to challenges from activist shareholders, such as proxy contests, media campaigns or other public or private means, could be costly and time consuming and could have an adverse effect on our reputation and divert the attention and resources of management and our board, which could have an adverse effect on our business and operational results. Additionally, shareholder activism could create uncertainty about our leadership or our future strategic direction, resulting in loss of future business opportunities, which could adversely affect our business, future operations, profitability and our ability to attract and retain qualified personnel. As of December 31, 2023, based on our review of public filings with the SEC, we believe over one-third of our stock is held by a combination of institutional investors, pooled investment funds, and certain other investors with a history of shareholder activism. One such investor has a Schedule 13D on file with the SEC that reserves that investor’s rights to pursue corporate governance changes, board structure changes, changes to capitalization, potential business combinations or dispositions involving the Company or certain of our businesses, or suggestions for improving the Company’s financial and/or operational performance.
In addition to risks associated with activist shareholders, some institutional investors are increasingly focused on environmental, social and governance (“ESG”) factors when allocating their capital. These investors may be seeking enhanced ESG disclosures and actions or may implement policies that discourage investment in certain of the industries, including the oil and gas industry, that we service. To the extent that certain institutional investors implement policies that discourage investments in industries that we service, it could have an adverse effect on our financing costs and access to sources of capital. Further, we may not succeed in implementing or communicating an ESG message that is well understood or received. As a result, we may experience diminished reputation or sentiment, reduced access to sources of capital, an inability to attract and retain qualified personnel and loss of customers, suppliers or subcontractors.
Our business is highly dependent on our ability to utilize the navigation canals adjacent to our facilities.
Our Houma Facilities are located on the Houma Navigation Canal approximately 30 miles from the GOM. The Houma Navigation Canal provides the shortest and least restrictive means of access from our facilities to open waters. These waterways are navigable waterways of the U.S. and, as such, are protected by federal law from unauthorized obstructions that would hinder water-borne traffic. Federal law also authorizes maintenance of these waterways by the U.S. Army Corps of Engineers. These waterways are dredged from time to time to maintain water depth and, while federal funding for dredging has historically been provided, there is no assurance that Congressional appropriations sufficient for adequate dredging and other maintenance of these waterways will be continued. If funding were not appropriated for that purpose, some or all of these waterways could become impassable by barges or other vessels required to transport many of our products.
22
Item 1B. Unresolved Staff Comments
None.
Item 1C. Cybersecurity
Risk Management and Strategy
Our cyber risk management program is integrated into our overall risk oversight program, which is designed to provide executive insight across the business to identify and monitor risks, opportunities and emerging trends that can impact our operations. Cybersecurity risks are identified and assessed through such risk oversight program. We also maintain a cyber insurance policy to mitigate the costs associated with potential cyber-attacks.
We utilize internal and external cybersecurity personnel to assess, detect, identify, manage, prevent and respond to cybersecurity threats and incidents. We regularly evaluate the threat landscape and our security controls, including through assessments, regular network and endpoint monitoring, vulnerability testing and penetration testing.
Our approach to cybersecurity includes strategic partnerships for our cybersecurity platforms, documented policies and procedures, end user training and resources to manage and monitor the evolving threat landscape, including through the gathering of actionable threat intelligence. We maintain and periodically evaluate and, as needed, update our incident response plan, which describes the processes we use to prepare for, detect, respond to and recover from a cybersecurity incident, including processes to assess severity, escalate, contain, investigate and remediate an incident, as well as to comply with potentially applicable legal obligations.
We have experienced targeted and non-targeted cybersecurity incidents in the past. However, prior cybersecurity incidents have not materially affected us. Notwithstanding our cyber risk management program, we may not be successful in preventing or mitigating a cybersecurity incident that could materially affect us, including our business strategy, results of operations or financial condition. See “Risk Factors” in Item 1A for further discussion of the risks we face from cybersecurity threats.
Governance
Our cybersecurity risk management and strategy processes are led by our Corporate Manager – Information Technology. This individual is responsible for assessing and managing our material risks from cybersecurity threats and overseeing the prevention, detection, mitigation and remediation of cybersecurity incidents through the management of, and participation in, our cybersecurity risk management process described in “Risk Management and Strategy” above. He has over 27 years of work experience in various roles involving managing information and operational technology security, cybersecurity and operational technology risk management, developing cybersecurity strategy, implementing effective information technology and cybersecurity processes and procedures, and experience in managing regulatory compliance.
While management is responsible for the day-to-day management of cybersecurity risks, our Board and Audit Committee have ongoing oversight roles. Our Audit Committee is responsible for overseeing cyber and related information technology security risks, including management’s actions to identify, assess, mitigate, and remediate material cyber risks. An annual report on our enterprise risks, including cybersecurity risks, is presented to the Audit Committee and/or the full Board. The annual report includes an overall cyber risk assessment and activities and action plans to mitigate cyber risks, as well as updates on the implementation and progress of previously discussed mitigation activities and action plans. The Audit Committee continues to review cybersecurity recommendations from our information technology personnel, with input from our director with cybersecurity expertise, in an effort to mitigate the associated risks of potential cyber-attacks.
Item 3. Legal Proceedings
See Note 7 of our Financial Statements in Item 8 for discussion of our legal proceedings, including the resolution of our MPSV Litigation, which is incorporated herein by reference.
Item 4. Mine Safety Disclosures
Not applicable.
23
PART II
Item 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities
Our common stock is traded on the Nasdaq Global Select Market, under the symbol “GIFI.” At February 23, 2024, there were 52 registered holders of our common stock, which does not include beneficial holders (also known as “street holders”) whose shares are held by banks, brokers, and other financial institutions.
Issuer Purchases of Equity Securities
The following table summarizes our purchases of common stock during the three months ended December 31, 2023.
|
|
|
|
|
|
|
|
Current Program (1) |
|
|||||||
Period |
|
Total Number of |
|
|
Average |
|
|
Total Number of |
|
|
Approximate Dollar Value of Shares that May Yet Be Purchased Under the Program |
|
||||
October 1 to 31, 2023 |
|
|
— |
|
|
$ |
— |
|
|
|
— |
|
|
$ |
— |
|
November 1 to 30, 2023 |
|
|
— |
|
|
$ |
— |
|
|
|
— |
|
|
$ |
— |
|
December 1 to 31, 2023 |
|
|
29,578 |
|
|
$ |
4.34 |
|
|
|
29,578 |
|
|
$ |
4,872 |
|
Total |
|
|
29,578 |
|
|
$ |
4.34 |
|
|
|
29,578 |
|
|
|
|
Item 6. Reserved
24
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following “Management’s Discussion and Analysis of Financial Condition and Results of Operations” is provided to assist readers in understanding our financial performance during the periods presented and significant trends that may impact our future performance. The results of operations reported and summarized below are not necessarily indicative of future operating results (refer to “Cautionary Statement on Forward-Looking Information” for further discussion). This discussion should be read in conjunction with our Financial Statements and the related notes thereto. References to “Notes” relate to the Notes to our Financial Statements in Item 8. References to “nm” relate to percentage references that are not considered meaningful. Certain terms are defined in the “Glossary of Terms” beginning on page ii.
Overview
We are a leading fabricator of complex steel structures and modules and provider of specialty services, including project management, hookup, commissioning, repair, maintenance, scaffolding, coatings, welding enclosures, civil construction and staffing services to the industrial and energy sectors. Our customers include U.S. and, to a lesser extent, international energy producers; refining, petrochemical, LNG, industrial and power operators; and EPC companies. We currently operate and manage our business through three operating divisions (“Services”, “Fabrication” and “Shipyard”) and one non-operating division (“Corporate”), which represent our reportable segments. Our corporate headquarters is located in The Woodlands, Texas and our primary operating facilities are located in Houma, Louisiana (“Houma Facilities”). See Note 9 and “Description of Operations” in Item 1 for further discussion of our reportable segments.
In the second quarter 2021, we sold our Shipyard Division operating assets and certain construction contracts (“Shipyard Transaction”). The Shipyard Transaction excluded the contracts and related obligations for our seventy-vehicle ferry and two forty-vehicle ferry projects (collectively, “Ferry Projects”) that were under construction as of the transaction date, and excluded the contracts and related obligations for the projects that were subject to our MPSV Litigation, which was resolved on October 4, 2023. The wind down of our remaining Shipyard Division operations was substantially completed in the fourth quarter 2023. Final completion of the wind down will occur upon completion of the warranty periods for the Ferry Projects, the last of which is anticipated to occur in the first quarter 2025. See Note 2 for further discussion of our Ferry Projects, Note 7 for further discussion of the resolution of our MPSV Litigation and Note 9 for further discussion of the wind down of our Shipyard Division operations.
Impacts of Oil and Gas Price Volatility and Macroeconomic Conditions on Operations
For over a decade, prices of oil and gas have experienced significant volatility, including depressed prices over extended periods, which negatively impacted our end markets and operating results. Beginning in 2020, the global coronavirus pandemic (“COVID-19”) added another layer of pressure and uncertainty on oil and gas prices (with oil prices reaching a twenty-year low and gas prices reaching a four-year low in 2020), which further negatively impacted certain of our end markets through the first quarter 2022. This volatility in oil and gas prices was compounded by Russia’s invasion of Ukraine in February 2022 (and the related European energy crisis), and the U.S. and other countries actions in response, as well as continued inflationary pressures, resulting in elevated energy prices (with oil prices reaching an eight-year high and gas prices reaching a fourteen-year high in 2022), which positively impacted certain of our end markets. While oil and gas prices declined in 2023, prices have somewhat stabilized, but the duration of such stability is uncertain and difficult to predict, particularly in light of geopolitical turmoil and uncertainty.
In addition, global economic factors that are beyond our control, have and could continue to impact our operations, including, but are not limited to, labor constraints, supply chain disruptions, inflationary pressures, economic slowdowns and recessions, natural disasters, public health crises, and geopolitical conflicts.
The ultimate business and financial impacts of oil and gas price volatility and macroeconomic conditions on our business and results of operations continues to be uncertain, but the impacts have included, or may continue to include, among other things, reduced bidding activity; suspension or termination of backlog; deterioration of customer financial condition; and unanticipated project costs and schedule delays due to supply chain disruptions, labor and material price increases, lower labor productivity, increased employee and contractor absenteeism and turnover, craft labor hiring challenges, increased safety incidents, lack of performance by subcontractors and suppliers, and contract disputes. We continue to monitor the impacts of oil and gas price volatility and macroeconomic conditions on our operations, and our estimates in future periods will be revised for any events and changes in circumstances arising after the date of this Report. See Note 1 and “Risk Factors” in Item 1A for further discussion of the impacts of oil and gas price volatility and macroeconomic conditions and Note 2 for further discussion of the impacts of the aforementioned on our projects.
25
Other Impacts to Operations
Hurricane Ida – During 2021, our operations were impacted by Hurricane Ida, which made landfall near Houma, Louisiana as a high-end Category 4 hurricane, causing debris and damage to our buildings and equipment at our Houma Facilities. During 2023 and 2022, we recorded gains for our Fabrication Division related to the net impact of insurance recoveries and costs associated with such damage. See Note 2 for further discussion of the impacts of Hurricane Ida.
Offshore Jackets Project – During 2022, we were awarded a large contract for the fabrication of offshore jackets for our Fabrication Division. In February 2023, we received direction from our customer to suspend all activities on the project, and in July 2023, the customer cancelled the contract. See Note 2 and “New Awards and Backlog” below for further discussion of the project cancellation.
MPSV Litigation – During 2023, we resolved our MPSV Litigation, resulting in a charge of $32.5 million for our Shipyard Division. In addition, we entered into the Settlement Agreement and Note Agreement. See Note 4 for further discussion of our Note Agreement and Note 7 for further discussion of the resolution of our MPSV Litigation and the Settlement Agreement.
Ferry Projects – During 2023 and 2022, we experienced construction challenges and cost increases on our Ferry Projects for our Shipyard Division. See Note 2 for further discussion of our Ferry Projects.
Initiatives to Improve Operating Results and Generate Stable, Profitable Growth
During 2020, we outlined a strategy to address our operational, market and economic challenges and position the Company to generate stable, profitable growth. Underpinning the first phase of our strategic transformation was a focus on the following initiatives:
With the significant progress achieved on these objectives, during 2021, we shifted our focus to the current phase of our strategic transformation, which is focused on generating stable, profitable growth. Underpinning this strategy is a focus on the following initiatives, which encompass any ongoing initiatives associated with the first phase of our strategic transformation:
26
Progress on the Current Phase of our Strategic Transformation
Efforts to expand our skilled workforce – We are focused on ways to improve retention and enhance and add to our skilled, craft personnel, as we believe a strong workforce will be a key differentiator in pursuing new project awards given the scarcity of available skilled labor. Our acquisition of a services and industrial staffing business in the fourth quarter 2021 nearly doubled our skilled workforce and expanded our geographic footprint for skilled labor. We have successfully maintained our overall headcount levels and have opportunistically looked to shift our workforce to higher margin opportunities given the industry-wide labor constraints. We continue to evaluate opportunities to expand our skilled labor headcount given the favorable demand trends, including strategic acquisitions to increase our craft labor headcount.
Efforts to further improve our resource utilization – We continue to take actions to improve our resource utilization through the rationalization and integration of our facilities and operations.
Efforts to further strengthen project execution and maintain bidding discipline – We have taken, and continue to take, actions to improve our project execution by enhancing our proposal, estimating and operations resources, processes and procedures. Our actions include strategic changes in management and key personnel, the addition of functional expertise, project management training, development of a formal “lessons learned” program, and other measures designed to strengthen our personnel, processes and procedures. Further, we are taking a disciplined approach to pursuing and bidding project opportunities, putting more rigor around our bid estimates to provide greater confidence that our estimates are achievable, increasing accountability and providing incentives for the execution of projects in line with our original estimates and subsequent forecasts, and incorporating previous experience into the bidding and execution of future projects. Additionally, we are focused on managing the risks associated with long-term fixed price contracts given the unpredictability of labor availability and labor and material costs, with a priority on increasing the mix of T&M contracts in our backlog.
Efforts to diversify our offshore services customer base, increase our offshore services offerings and expand our services business to include onshore facilities along the Gulf Coast – We believe diversifying and expanding our services business will deliver a more stable revenue stream while providing underpinning work to recruit, develop and retain our craft professionals. Our acquisition of a services and industrial staffing business in the fourth quarter 2021 accelerated our progress in this initiative and provided a stronger platform to continue such progress. Further, in the third quarter 2022, we made capital and other investments to expand our offshore services offering to include welding enclosures, which provide a safe environment for welding, cutting and burning without the need to shut down operations. We are also pursuing opportunities to partner with original equipment manufacturers to provide critical services to our customers along the Gulf Coast and strategic partnership opportunities with engineering companies to provide turnkey solutions.
27
Efforts to continue to pursue opportunities in our traditional offshore fabrication markets – We continue to fabricate structures associated with our traditional offshore markets, including subsea and associated structures. During 2022, we were awarded a large contract for the fabrication of offshore jackets; however, the project was suspended in February 2023 and cancelled in July 2023. See Note 2 and “New Project Awards and Backlog” below for further discussion of the project cancellation. During 2023, we were awarded multiple contracts for the fabrication of subsea structures, resulting from our previous strategic decision to focus our resources on the subsea fabrication market. We expect subsea fabrication activity to remain strong well into 2024, associated with anticipated subsea developments across the GOM, Guyana and Brazil.
Efforts to reduce our reliance on the offshore oil and gas construction sector, pursue new growth end markets and increase our T&M versus fixed price revenue mix – While we continue to pursue opportunities in our traditional offshore markets, we are pursuing initiatives to grow our business and diversify our revenue mix.
28
Operating Outlook
Our focus remains on securing profitable new project awards and backlog and generating operating income and cash flows, while ensuring the safety and well-being of our workforce. Our success, including achieving the aforementioned initiatives, will be determined by, among other things:
In addition, the near-term utilization of our Fabrication Division will be impacted by the timing of new project awards and their execution, including the replacement of our cancelled offshore jackets project, and our operations may continue to be impacted by inefficiencies and disruptions associated with employee turnover, craft labor hiring challenges, engineering delays, and supplier and subcontractor disruptions. Our results may also be adversely affected by (i) costs associated with the retention of certain personnel that may be temporarily under-utilized as we evaluate our resource requirements to support our future operations, (ii) investments in key personnel and process improvement efforts to support our aforementioned initiatives, and (iii) higher costs and availability of craft labor due to industry labor constraints. See Note 1 for further discussion of the impacts of oil and gas price volatility and macroeconomic conditions, Note 2 and “Results of Operations” below for further discussion of our project impacts, and Note 2 and “New Project Awards and Backlog” below for further discussion of the project cancellation.
New Project Awards and Backlog
New project awards represent expected revenue values of new contract commitments received during a given period, including scope growth on existing commitments. A commitment represents authorization from our customer to begin work or purchase materials pursuant to a written agreement, letter of intent or other form of authorization. Backlog represents the unrecognized revenue for our new project awards and at December 31, 2023, was consistent with the value of remaining performance obligations for our contracts required to be disclosed under Topic 606 and presented in Note 2. In general, a performance obligation is a contractual obligation to construct and/or transfer a distinct good or service to a customer. The transaction price of a contract is allocated to each distinct performance obligation and recognized as revenue when, or as, the performance obligation is satisfied. We believe that backlog, a non-GAAP financial measure, provides useful information to investors as it represents work that we are obligated to perform under our current contracts. New project awards and backlog may vary significantly each reporting period based on the timing of our major new contract commitments.
29
Projects in our backlog are generally subject to delay, suspension, termination, or an increase or decrease in scope at the option of the customer; however, the customer is required to pay us for work performed and materials purchased through the date of termination, suspension, or decrease in scope. Depending on the size of the project, the delay, suspension, termination or increase or decrease in scope of any one contract could significantly impact our backlog and change the expected amount and timing of revenue recognized. New project awards by operating segment for 2023 and 2022, are as follows (in thousands):
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Services |
|
$ |
92,728 |
|
|
$ |
85,846 |
|
Fabrication (1) |
|
|
66,629 |
|
|
|
154,239 |
|
Shipyard |
|
|
(528 |
) |
|
|
834 |
|
Eliminations |
|
|
(1,110 |
) |
|
|
(672 |
) |
Total |
|
$ |
157,719 |
|
|
$ |
240,247 |
|
Backlog by operating segment at December 31, 2023 and 2022, is as follows (in thousands):
|
|
December 31, |
|
|||||||||||||
|
|
2023 |
|
|
2022 |
|
||||||||||
|
|
Amount |
|
|
Labor hours |
|
|
Amount |
|
|
Labor hours |
|
||||
Services |
|
$ |
502 |
|
|
|
4 |
|
|
$ |
1,322 |
|
|
|
20 |
|
Fabrication (1) |
|
|
11,739 |
|
|
|
104 |
|
|
|
110,287 |
|
|
|
613 |
|
Shipyard |
|
|
709 |
|
|
|
1 |
|
|
|
3,272 |
|
|
|
22 |
|
Total (2) |
|
$ |
12,950 |
|
|
|
109 |
|
|
$ |
114,881 |
|
|
|
655 |
|
Critical Accounting Policies
Our Financial Statements are prepared in accordance with generally accepted accounting principles in the U.S. (“GAAP”) which require us to make estimates and judgments that affect the reported amounts of assets, liabilities, revenue and expenses and related disclosure of contingent assets and liabilities. We continually evaluate our estimates and judgments based on historical experience and various other assumptions that we believe to be reasonable under the circumstances. We also discuss the development and selection of our critical accounting policies with the Audit Committee of our Board of Directors. We believe the following critical accounting policies affect our more significant judgments and estimates used in the preparation of our Financial Statements.
Revenue Recognition
General – Our revenue is derived from customer contracts and agreements that are awarded on a competitively bid and negotiated basis using a range of contracting options, including fixed-price, unit-rate, T&M and cost-reimbursable, or a combination thereof. Our contracts primarily relate to the fabrication of steel structures and modules, and certain service arrangements. We recognize revenue from our contracts in accordance with Accounting Standards Update (“ASU”) 2014-09, Topic 606 “Revenue from Contracts with Customers” (“Topic 606”).
Topic 606 requires entities to recognize revenue in a way that depicts the transfer of promised goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services. Additionally, provisions of Topic 606 specify which goods and services are distinct and represent separate performance obligations (representing the unit of account in Topic 606) within a contract and which goods and services (which could include multiple contracts or agreements) should be aggregated. In general, a performance obligation is a contractual obligation to construct and/or transfer a distinct good or service to a customer. The transaction price of a contract is allocated to each distinct performance obligation and recognized as revenue when, or as, the performance obligation is satisfied. Revenue for performance obligations satisfied over time are recognized as the work progresses. Revenue for performance obligations that do not meet the criteria for over time recognition are recognized at a point-in-time when a performance obligation is complete and a customer has obtained control of a promised asset.
30
Long-term Contracts Satisfied Over Time – Revenue for our long-term contracts is recognized using the POC method based on contract costs incurred to date compared to total estimated contract costs (an input method). Fixed-price contracts, or contracts with a more significant fixed-price component, generally provide us with greater control over project schedule and the timing of when work is performed and costs are incurred, and accordingly, when revenue is recognized. Unit-rate, T&M and cost-reimbursable contracts generally have more variability in the scope of work and provide our customers with greater influence over the timing of when we perform our work, and accordingly, such contracts often result in less predictability with respect to the timing of when revenue is recognized. Contract costs include direct costs, such as materials and labor, and indirect costs attributable to contract activity. Material costs that are significant to a contract and do not reflect an accurate measure of project completion are excluded from the determination of our contract progress. Revenue for such materials is only recognized to the extent of costs incurred. Revenue and gross profit or loss for contracts accounted for using the POC method can be significantly affected by changes in estimated cost to complete such contracts. Significant estimates impacting the cost to complete a contract include: forecast costs of engineering, materials, equipment and subcontracts; forecast costs of labor and labor productivity; schedule durations, including subcontractor and supplier progress; contract disputes, including claims; achievement of contractual performance requirements; and contingency, among others. Although our customers retain the right and ability to change, modify or discontinue further work at any stage of a contract, in the event our customers discontinue work, they are required to compensate us for the work performed to date. The cumulative impact of revisions in total cost estimates during the progress of work is reflected in the period in which these changes become known, including, to the extent required, the reversal of profit recognized in prior periods and the recognition of losses expected to be incurred on contracts. Due to the various estimates inherent in our contract accounting, actual results could differ from those estimates, which could result in material changes to our Financial Statements and related disclosures.
Short-term Contracts and Contracts Satisfied at a Point In Time – Revenue for our short-term contracts (which includes revenue associated with our master services arrangements) and contracts that do not satisfy the criteria for revenue recognition over time is recognized when the work is performed or when control of the asset is transferred, the related costs are incurred and collection is reasonably assured.
Variable Consideration – Revenue and gross profit or loss for contracts can be significantly affected by variable consideration, which can be in the form of unapproved change orders, claims (including amounts arising from disputes with customers), incentives and liquidated damages that may not be resolved until the later stages of the contract or after the contract has been completed. Variable consideration can also include revenue associated with work performed on a unit-rate, T&M or cost-reimbursable basis that is recognized using the POC method. We estimate variable consideration based on the amount we expect to be entitled and include estimated amounts in transaction price to the extent it is probable that a significant future reversal of cumulative revenue recognized will not occur or when we conclude that any significant uncertainty associated with the variable consideration is resolved.
See Note 1 for further discussion of our revenue recognition policy and Note 2 for further discussion of projects with significant changes in estimated margins during 2023 and 2022 and discussion of unapproved change orders, claims, incentives and liquidated damages for our projects.
Long-Lived Assets
Goodwill – Goodwill is not amortized, but instead is reviewed for impairment at least annually at a reporting unit level, absent any indicators of impairment or when other actions require an impairment assessment (such as a change in reporting units). Our Services Division represents our only reporting unit with goodwill. We perform our annual impairment assessment during the fourth quarter of each year based upon balances as of October 1. In evaluating goodwill for impairment, we have the option to first assess qualitative factors to determine whether it is more likely than not that the fair value of our reporting unit is greater than its carrying value. If we determine that it is more likely than not that the carrying value of the reporting unit is greater than its fair value, we perform a quantitative impairment test by calculating the fair value of the reporting unit and comparing it to the carrying value of the reporting unit, and we recognize an impairment charge to the extent its carrying value exceeds its fair value. To determine the fair value of our reporting unit and test for impairment, we utilize an income approach (discounted cash flow method) as we believe this is the most direct approach to incorporate the specific economic attributes and risk profile of our reporting unit into our valuation model. If, based on future assessments, our goodwill is deemed to be impaired, the impairment would result in a charge to our operating results in the period of impairment. See Note 3 for further discussion of our annual goodwill impairment assessment.
Other Long-Lived Assets – Our property, plant and equipment, lease assets (included within other noncurrent assets) and finite-lived intangible assets are reviewed for impairment when events or changes in circumstances indicate that the carrying amount may not be recoverable. If a recoverability assessment is required, we compare the estimated future undiscounted cash flow associated with the asset or asset group to its carrying amount to determine if an impairment exists. An asset group constitutes the minimum level for which identifiable cash flows are principally independent of the cash flows of other assets or asset groups. An impairment loss is measured by comparing the fair value of the asset or asset group to its carrying amount and the excess of the carrying amount of the asset or asset group over its fair value is recorded as an impairment charge. Fair value is determined based on discounted cash flows, appraised values or third-party indications of value, as appropriate. We had no indicators of impairment during 2023.
31
Income Taxes
Income taxes have been provided for using the liability method. Deferred income taxes reflect the net tax effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for income tax purposes using enacted rates expected to be in effect during the year in which the differences are expected to reverse. Due to state income tax laws related to the apportionment of revenue for our projects, judgment is required to estimate the effective tax rate expected to apply to tax differences that are expected to reverse in the future.
A valuation allowance is provided to reserve for deferred tax assets (“DTA(s)”) if, based upon the available evidence, it is more likely than not that some or all of the DTAs will not be realized. The realization of our DTAs depends on our ability to generate sufficient taxable income of the appropriate character and in the appropriate jurisdictions.
Reserves for uncertain tax positions are recognized when we consider it more likely than not that additional tax will be due in excess of amounts reflected in our income tax returns, irrespective of whether or not we have received tax assessments. Interest and penalties on uncertain tax positions are recorded within income tax expense. See Note 5 for further discussion of our income taxes, DTAs and valuation allowance.
Stock-Based Compensation
Awards under our stock-based compensation plans are calculated using a fair value-based measurement method. Depending on the terms of the award, we use the straight-line or graded vesting methods to recognize share-based compensation expense over the requisite service period of the award. We recognize the excess tax benefit or tax deficiency resulting from the difference between the deduction we receive for tax purposes and the stock-based compensation expense we recognize for financial reporting purposes created when common stock vests, as an income tax benefit or expense in our Statement of Operations. See Note 6 for further discussion of our stock-based and other compensation plans.
Insurance
We maintain insurance coverage for various aspects of our business and operations. However, we may be exposed to future losses due to coverage limitations and our use of deductibles and self-insured retentions for our exposures related to property and equipment damage, builder’s risk, third-party liability and workers’ compensation and USL&H claims. In connection with our insurance coverage renewal for our property and equipment during 2023, we determined that the benefits of maintaining insurance coverage for our property and equipment were limited due to high premium costs and deductibles and increased coverage limitations. Accordingly, we did not renew all of our property and equipment coverage and are now generally self-insured for exposures resulting from any future damage to our property and equipment.
To the extent we have insurance coverage, we do not have an offset right for liabilities in excess of any deductibles and self-insured retentions. Accordingly, we have recorded a liability for estimated amounts in excess of our deductibles and retentions, and have recorded a corresponding asset related to estimated insurance recoveries, on our Balance Sheet. Further, to the extent we are self-insured, reserves are recorded based upon our estimates, with input from legal and insurance advisors. Changes in assumptions, as well as changes in actual experience, could cause these estimates to change. See Note 2 for discussion of insurance deductibles incurred associated with damage caused by Hurricanes Ida and Note 7 for further discussion of our insurance coverages.
Fair Value Measurements
Our fair value determinations for financial assets and liabilities are based on the particular facts and circumstances. Financial instruments are required to be categorized within a valuation hierarchy based upon the lowest level of input that is significant to the fair value measurement. The three levels of the valuation hierarchy are as follows:
See Note 1 for further discussion of our fair value measurements.
32
Results of Operations – Comparison of 2023 and 2022 (in thousands, except for percentages)
Consolidated
|
|
Years Ended December 31, |
|
|
Favorable |
|
||||||
|
|
2023 |
|
|
2022 |
|
|
Change |
|
|||
New project awards |
|
$ |
157,719 |
|
|
$ |
240,247 |
|
|
$ |
(82,528 |
) |
|
|
|
|
|
|
|
|
|
|
|||
Revenue |
|
$ |
151,067 |
|
|
$ |
142,320 |
|
|
$ |
8,747 |
|
Cost of revenue |
|
|
162,968 |
|
|
|
134,425 |
|
|
|
(28,543 |
) |
Gross profit (loss) |
|
|
(11,901 |
) |
|
|
7,895 |
|
|
|
(19,796 |
) |
Gross profit (loss) percentage |
|
|
(7.9 |
)% |
|
|
5.5 |
% |
|
|
|
|
General and administrative expense |
|
|
16,278 |
|
|
|
18,214 |
|
|
|
1,936 |
|
Other (income) expense, net |
|
|
(2,296 |
) |
|
|
(6,904 |
) |
|
|
(4,608 |
) |
Operating loss |
|
|
(25,883 |
) |
|
|
(3,415 |
) |
|
|
(22,468 |
) |
Interest (expense) income, net |
|
|
1,440 |
|
|
|
86 |
|
|
|
1,354 |
|
Loss before income taxes |
|
|
(24,443 |
) |
|
|
(3,329 |
) |
|
|
(21,114 |
) |
Income tax (expense) benefit |
|
|
41 |
|
|
|
(23 |
) |
|
|
64 |
|
Net loss |
|
$ |
(24,402 |
) |
|
$ |
(3,352 |
) |
|
$ |
(21,050 |
) |
New project awards – New project awards for 2023 and 2022 were $157.7 million and $240.2 million, respectively. Other than noted below, new project awards for both periods were primarily related to:
The 2022 period also included the award of a large contract for the fabrication of offshore jackets (which was awarded in the third quarter 2022 and cancelled by the customer in July 2023) for our Fabrication Division.
Revenue – Revenue for 2023 and 2022 was $151.1 million and $142.3 million, respectively, representing an increase of 6.1%. The increase was primarily due to:
See Note 7 for further discussion of the resolution of our MPSV Litigation.
33
Gross profit (loss) – Gross loss for 2023 was $11.9 million (7.9% of revenue) and gross profit for 2022 was $7.9 million (5.5% of revenue), respectively. Gross loss for 2023 was primarily impacted by:
The gross loss for 2023 relative to gross profit for 2022 was primarily due to:
See Note 2 and “Operating Segments” below for further discussion of our project impacts and Note 7 for further discussion of the resolution of our MPSV Litigation.
General and administrative expense – General and administrative expense for 2023 and 2022 was $16.3 million and $18.2 million, respectively, representing a decrease of 10.6%. The decrease was primarily due to:
General and administrative expense included legal and advisory fees of $3.2 million and $4.5 million for 2023 and 2022, respectively, associated with our MPSV Litigation, which are reflected within our Shipyard Division. See Note 7 for further discussion of the resolution of our MPSV Litigation.
Other (income) expense, net – Other (income) expense, net for 2023 and 2022 was income of $2.3 million and $6.9 million, respectively. Other (income) expense, net generally represents recoveries or provisions for bad debts and credit losses, gains or losses associated with the sale or disposition of property and equipment, and income or expense associated with certain nonrecurring items. Other income for 2023 was primarily due to:
34
Other income for 2022 was primarily due to:
See Note 2 for further discussion of the impacts of Hurricane Ida.
Interest (expense) income, net – Interest (expense) income, net for 2023 and 2022 was income of $1.4 million and $0.1 million, respectively. Interest (expense) income, net for both periods included the net impact of interest earned on our cash and short-term investment balances and interest incurred on the unused portion of our LC Facility and on our Insurance Finance Arrangements. The increase in income for 2023 relative to 2022 was primarily due to higher interest earned on our cash and short-term investment balances for the 2023 period.
Income tax (expense) benefit – Income tax (expense) benefit for 2023 and 2022 represents state income taxes. No federal income tax benefit was recorded for our losses for either period as a full valuation allowance was recorded against our net deferred tax assets generated during the periods.
Operating Segments
Services Division
|
|
Years Ended December 31, |
|
|
Favorable |
|
||||||
|
|
2023 |
|
|
2022 |
|
|
Change |
|
|||
New project awards |
|
$ |
92,728 |
|
|
$ |
85,846 |
|
|
$ |
6,882 |
|
|
|
|
|
|
|
|
|
|
|
|||
Revenue |
|
$ |
93,548 |
|
|
$ |
87,022 |
|
|
$ |
6,526 |
|
Gross profit |
|
|
13,783 |
|
|
|
11,227 |
|
|
|
2,556 |
|
Gross profit percentage |
|
|
14.7 |
% |
|
|
12.9 |
% |
|
|
|
|
General and administrative expense |
|
|
2,902 |
|
|
|
2,997 |
|
|
|
95 |
|
Other (income) expense, net |
|
|
(48 |
) |
|
|
106 |
|
|
|
154 |
|
Operating income |
|
|
10,929 |
|
|
|
8,124 |
|
|
|
2,805 |
|
New project awards – New project awards for 2023 and 2022 were $92.7 million and $85.8 million, respectively, and were primarily related to offshore services work for both periods, with the increase due to incremental new project awards associated with our welding enclosures business line (commenced in the third quarter 2022).
Revenue – Revenue for 2023 and 2022 was $93.5 million and $87.0 million, respectively, representing an increase of 7.5%. The increase was primarily due to incremental revenue associated with our welding enclosures business line (commenced in the third quarter 2022).
Gross profit – Gross profit for 2023 and 2022 was $13.8 million (14.7% of revenue) and $11.2 million (12.9% of revenue), respectively. The increase in gross profit for 2023 relative to 2022 was primarily due to:
General and administrative expense – General and administrative expense for 2023 and 2022 was $2.9 million and $3.0 million, respectively, representing a decrease of 3.2%.
Other (income) expense, net – Other (income) expense, net for 2023 and 2022 was income of less than $0.1 million and expense of $0.1 million, respectively.
35
Fabrication Division
|
|
Years Ended December 31, |
|
|
Favorable |
|
||||||
|
|
2023 |
|
|
2022 |
|
|
Change |
|
|||
New project awards |
|
$ |
66,629 |
|
|
$ |
154,239 |
|
|
$ |
(87,610 |
) |
|
|
|
|
|
|
|
|
|
|
|||
Revenue |
|
$ |
89,046 |
|
|
$ |
48,299 |
|
|
$ |
40,747 |
|
Gross profit (loss) |
|
|
10,178 |
|
|
|
(274 |
) |
|
|
10,452 |
|
Gross profit (loss) percentage |
|
|
11.4 |
% |
|
|
(0.6 |
)% |
|
|
|
|
General and administrative expense |
|
|
1,885 |
|
|
|
2,306 |
|
|
|
421 |
|
Other (income) expense, net |
|
|
(2,265 |
) |
|
|
(7,454 |
) |
|
|
(5,189 |
) |
Operating income |
|
|
10,558 |
|
|
|
4,874 |
|
|
|
5,684 |
|
New project awards – New project awards for 2023 and 2022 were $66.6 million and $154.2 million, respectively, and were primarily related to small-scale fabrication work for both periods and a large contract for the fabrication of offshore jackets for 2022 (which was awarded in the third quarter 2022 and cancelled by the customer in July 2023).
Revenue – Revenue for 2023 and 2022 was $89.0 million and $48.3 million, respectively, representing an increase of 84.4%. The increase was primarily due to:
Gross profit (loss) – Gross profit for 2023 was $10.2 million (11.4% of revenue) and gross loss for 2022 was $0.3 million (0.6% of revenue). Gross profit for 2023 was primarily impacted by:
The gross profit for 2023 relative to gross loss for 2022 was primarily due to:
Our Fabrication Division utilization for 2023 and 2022 benefited by $0.1 million and $0.7 million, respectively, from providing resources and facilities to our Shipyard Division for our Ferry Projects. See Note 2 for further discussion of our project impacts.
General and administrative expense – General and administrative expense for 2023 and 2022 was $1.9 million and $2.3 million, respectively, representing a decrease of 18.3%. The decrease was primarily due to lower business development costs.
Other (income) expense, net – Other (income) expense, net for 2023 and 2022 was income of $2.3 million and $7.5 million, respectively. Other income for 2023 was primarily due to:
Other income for 2022 was primarily due to gains of $7.5 million related to the net impact of insurance recoveries and costs associated with damage previously caused by Hurricane Ida to buildings and equipment at our Houma Facilities.
36
Shipyard Division
|
|
Years Ended December 31, |
|
|
Favorable |
|
||||||
|
|
2023 |
|
|
2022 |
|
|
Change |
|
|||
New project awards |
|
$ |
(528 |
) |
|
$ |
834 |
|
|
$ |
(1,362 |
) |
|
|
|
|
|
|
|
|
|
|
|||
Revenue |
|
$ |
(30,417 |
) |
|
$ |
7,671 |
|
|
$ |
(38,088 |
) |
Gross loss |
|
|
(35,862 |
) |
|
|
(3,058 |
) |
|
|
(32,804 |
) |
Gross loss percentage |
|
nm |
|
|
|
(39.9 |
)% |
|
|
|
||
General and administrative expense |
|
|
3,205 |
|
|
|
4,469 |
|
|
|
1,264 |
|
Other (income) expense, net |
|
|
307 |
|
|
|
27 |
|
|
|
(280 |
) |
Operating loss |
|
|
(39,374 |
) |
|
|
(7,554 |
) |
|
|
(31,820 |
) |
New project awards – New project awards for 2023 and 2022 were negative $0.5 million and $0.8 million, respectively. The negative new project awards for 2023 were due to liquidated damages and contract price adjustments on our Ferry Projects.
Revenue – Revenue for 2023 and 2022 was negative $30.4 million and $7.7 million, respectively. The decrease was primarily due to:
See Note 4 for further discussion of the Note Agreement and Note 7 for further discussion of the resolution of our MPSV Litigation and the Settlement Agreement.
Gross loss – Gross loss for 2023 and 2022 was $35.9 million and $3.1 million (39.9% of revenue), respectively. The gross loss for 2023 was primarily due to:
The increase in gross loss for 2023 relative to 2022 was primarily due to:
See Note 2 for further discussion of our project impacts and Note 7 for further discussion of the resolution of our MPSV Litigation.
37
General and administrative expense – General and administrative expense for 2023 and 2022 was $3.2 million and $4.5 million, respectively, representing a decrease of 28.3%. General and administrative expense relates to legal and advisory fees associated with our MPSV Litigation, which was resolved in the fourth quarter 2023. See Note 7 for further discussion of the resolution of our MPSV Litigation.
Other (income) expense, net – Other (income) expense, net for 2023 and 2022 was expense of $0.3 million and less than $0.1 million, respectively. Other expense for 2023 and 2022 was primarily due to:
Corporate Division
|
|
Years Ended December 31, |
|
|
Favorable |
|
||||||
|
|
2023 |
|
|
2022 |
|
|
Change |
|
|||
New project awards (eliminations) |
|
$ |
(1,110 |
) |
|
$ |
(672 |
) |
|
$ |
(438 |
) |
|
|
|
|
|
|
|
|
|
|
|||
Revenue (eliminations) |
|
$ |
(1,110 |
) |
|
$ |
(672 |
) |
|
$ |
(438 |
) |
Gross profit |
|
|
— |
|
|
|
— |
|
|
|
— |
|
General and administrative expense |
|
|
8,286 |
|
|
|
8,442 |
|
|
|
156 |
|
Other (income) expense, net |
|
|
(290 |
) |
|
|
417 |
|
|
|
707 |
|
Operating loss |
|
|
(7,996 |
) |
|
|
(8,859 |
) |
|
|
863 |
|
General and administrative expense – General and administrative expense for 2023 and 2022 was $8.3 million and $8.4 million, respectively, representing a decrease of 1.8%.
Other (income) expense, net – Other (income) expense, net for 2023 and 2022 was income of $0.3 million and expense of $0.4 million, respectively. Other expense for 2022 was primarily due to an impairment charge of $0.5 million associated with the underlying right-of-use asset for our corporate office lease, resulting from a sublease arrangement with a third-party.
38
Liquidity and Capital Resources
Available Liquidity
Our primary sources of liquidity are our cash, cash equivalents and scheduled maturities of short-term investments. At December 31, 2023, our cash, cash equivalents, short-term investments and restricted cash totaled $47.9 million, as follows (in thousands):
|
|
December 31, |
|
|
Cash and cash equivalents |
|
$ |
38,176 |
|
Short-term investments (1) |
|
|
8,233 |
|
Available cash, cash equivalents and short-term investments |
|
|
46,409 |
|
Restricted cash |
|
|
1,475 |
|
Total cash, cash equivalents, short-term investments and restricted cash |
|
$ |
47,884 |
|
Our available liquidity is impacted by changes in our working capital and our capital expenditure requirements. Fluctuations in working capital, and its components, are not unusual in our business and are impacted by the size of our projects and the mix of our backlog. Our working capital is particularly impacted by the timing of new project awards and related payments in advance of performing work, and the subsequent achievement of billing milestones or project progress on backlog. Working capital is also impacted at period-end by the timing of contract receivables collections and accounts payable payments on our projects.
At December 31, 2023, our working capital was $71.8 million and included $47.9 million of cash, cash equivalents, short-term investments and restricted cash, $5.6 million of assets held for sale and $1.1 million of current debt. Excluding cash, cash equivalents, short-term investments, restricted cash, assets held for sale and current debt, our working capital at December 31, 2023 was $19.3 million, and consisted of net contract assets and contract liabilities of negative $2.7 million; contract receivables and retainage of $36.3 million; inventory, prepaid expenses and other assets of $9.1 million; and accounts payable, accrued expenses and other liabilities of $23.3 million. The components of our working capital (excluding cash, cash equivalents, short-term investments, restricted cash, assets held for sale and current debt) at December 31, 2023 and 2022, and changes in such amounts during 2023, were as follows (in thousands):
|
|
December 31, |
|
|
|
|
||||||
|
|
2023 |
|
|
2022 |
|
|
Change (3) |
|
|||
Contract assets |
|
$ |
2,739 |
|
|
$ |
4,839 |
|
|
$ |
2,100 |
|
Contract liabilities (1) |
|
|
(5,470 |
) |
|
|
(8,196 |
) |
|
|
(2,726 |
) |
Contracts in progress, net (2) |
|
|
(2,731 |
) |
|
|
(3,357 |
) |
|
|
(626 |
) |
Contract receivables and retainage, net |
|
|
36,298 |
|
|
|
29,427 |
|
|
|
(6,871 |
) |
Prepaid expenses, inventory and other current assets |
|
|
9,066 |
|
|
|
8,074 |
|
|
|
(992 |
) |
Accounts payable, accrued expenses and other liabilities |
|
|
(23,302 |
) |
|
|
(22,593 |
) |
|
|
709 |
|
Total |
|
$ |
19,331 |
|
|
$ |
11,551 |
|
|
$ |
(7,780 |
) |
39
Cash Flow Activity (in thousands)
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Net cash provided by (used in) operating activities |
|
$ |
7,197 |
|
|
$ |
(8,923 |
) |
Net cash used in investing activities |
|
$ |
(503 |
) |
|
$ |
(8,870 |
) |
Net cash used in financing activities |
|
$ |
(1,867 |
) |
|
$ |
(1,972 |
) |
Operating Activities – Cash provided by operating activities for 2023 was $7.2 million and cash used in operating activities for 2022 was $8.9 million, and was primarily due to the net impacts of the following:
2023 Activity
2022 Activity
40
Investing Activities – Cash used in investing activities for 2023 and 2022 was $0.5 million and $8.9 million, respectively. Cash used in investing activities for 2023 was primarily due to capital expenditures of $2.9 million, offset partially by proceeds from asset sales of $0.5 million, recoveries from insurance claims of $0.2 million, and net maturities of short-term investments of $1.7 million. Cash used in investing activities for 2022 was primarily due to purchases of short-term investments of $9.9 million and capital expenditures of $3.1 million, offset partially by proceeds from the Shipyard Transaction of $0.9 million, proceeds from asset sales of $2.0 million, and recoveries from insurance claims of $1.2 million.
Financing Activities – Cash used in financing activities for 2023 and 2022 was $1.9 million and $2.0 million, respectively. Cash used in financing activities for 2023 and 2022 was primarily due to payments on our Insurance Finance Arrangement of $1.3 million and $1.7 million, respectively, and tax payments made on behalf of employees from vested stock withholdings. The 2023 period also included the repurchase of $0.1 million of our common stock under our Share Repurchase Program. See Note 8 for further discussion of our Share Repurchase Program.
Credit Facilities
See Note 4 for discussion of our LC Facility, Surety Bonds, Note Agreement, Mortgage Agreement, Restrictive Covenant Agreement and Insurance Finance Arrangements.
Registration Statement
We have a shelf registration statement that is effective with the SEC that expires on August 24, 2026. The shelf registration statement enables us to issue up to $200.0 million in either debt or equity securities, or a combination thereof, from time to time subsequent to the filing of a prospectus supplement, which among other things, identifies the underwriter, dealer or agent, specifies the number and value of securities that may be sold, and provides a time frame over which the securities may be offered.
Liquidity Outlook
We have made significant progress in our efforts to preserve and improve our liquidity, including cost reductions, the sale of under-utilized assets and facilities, improved project cash flow management and the completion of the Shipyard Transaction. The primary uses of our liquidity for 2024 and the foreseeable future are to fund:
We anticipate capital expenditures of $4.5 million to $5.5 million for 2024, of which approximately $3.5 million relates to upgrades to our Houma Facilities and investments in more technologically advanced equipment. In January 2024, we received insurance proceeds of $2.0 million associated with damage to our Houma Facilities previously caused by Hurricane Ida, which will partially supplement our capital expenditures for 2024. Further investments in our facilities may be required to win and execute potential new project awards, which are not included in these estimates. See Note 2 for further discussion of the impacts of Hurricane Ida.
41
We believe that our cash, cash equivalents and short-term investments at December 31, 2023, will be sufficient to enable us to fund our operating expenses, meet our working capital and capital expenditure requirements, and satisfy any debt service obligations or other funding requirements, for 2024 and the foreseeable future. Our evaluation of the sufficiency of our cash and liquidity is primarily based on our financial forecast for 2024 and 2025, which is impacted by our existing backlog and estimates of future new project awards and may be further impacted by the ongoing effects of oil and gas price volatility and macroeconomic conditions, and future losses, if any, due to coverage limitations and our use of deductibles and self-insured retentions for our exposures related to property and equipment damage, builder’s risk, third-party liability and workers’ compensation and USL&H claims. We can provide no assurances that our financial forecast will be achieved or that we will have sufficient cash and short-term investments to meet planned operating expenses and unforeseen cash requirements. Accordingly, we may be required to obtain new or additional credit facilities, sell additional assets or conduct equity or debt offerings at a time when it is not beneficial to do so.
Off-Balance Sheet Arrangements
We are not a party to any contract or other obligation not included on our Balance Sheet that has, or is reasonably likely to have, a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.
Item 7A. Quantitative and Qualitative Disclosures About Market Risk
Not applicable.
Item 8. Financial Statements and Supplementary Data
In this Report our Financial Statements and the accompanying notes appear on pages F-1 through F-26 and are incorporated herein by reference. See Index to Financial Statements on page 44.
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure
None.
Item 9A. Controls and Procedures
Evaluation of Disclosure Controls and Procedures
We maintain disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that we file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in the SEC rules and forms, and that such information is communicated to management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. Management, with the participation of our Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of our disclosure controls and procedures (as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934) as of the end of the period covered by this report. Based on this evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that the design and operation of our disclosure controls and procedures were effective as of the end of the period covered by this Report.
Management’s Report on Internal Control Over Financial Reporting
Management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rule 13a-15(f). Under the supervision and with the participation of management, including our Chief Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of our internal control over financial reporting based on the framework in Internal Control – Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework). Based on our evaluation under the framework in Internal Control – Integrated Framework, our management concluded that our internal control over financial reporting was effective as of December 31, 2023.
Changes in Internal Control Over Financial Reporting
There were no changes in our internal control over financial reporting that occurred during the fourth quarter 2023, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
42
Item 9B. Other Information
Not applicable.
Item 9C. Disclosure Regarding Foreign Jurisdiction That Prevent Inspections
Not applicable.
PART III
Item 10. Directors, Executive Officers and Corporate Governance
We have adopted a Code of Ethics for the Chief Executive Officer, the Chief Financial Officer, and the Chief Accounting Officer and persons performing similar functions (the “Code of Ethics”) and a Code of Business Conduct and Ethics, which applies to all employees and directors, including the Chief Executive Officer, the Chief Financial Officer, the Chief Accounting Officer and persons performing similar functions. These codes are available to the public on our Internet website at www.gulfisland.com. Any substantive amendments to the Code of Ethics or any waivers granted under the Code of Ethics will be disclosed within four business days of such event on our website. Such information will remain available on our website for at least twelve months.
The remaining information required by this item may be found in our definitive proxy statement prepared in connection with our 2024 annual meeting of shareholders and is incorporated herein by reference.
Item 11. Executive Compensation
Information required by this item may be found in our definitive proxy statement prepared in connection with our 2024 annual meeting of shareholders and is incorporated herein by reference.
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholders Matters
Information required by this item may be found in our definitive proxy statement prepared in connection with our 2024 annual meeting of shareholders and is incorporated herein by reference.
Information required by this item may be found in our definitive proxy statement prepared in connection with our 2024 annual meeting of shareholders and is incorporated herein by reference.
Item 14. Principal Accounting Fees and Services
Information required by this item may be found in our definitive proxy statement prepared in connection with our 2024 annual meeting of shareholders and is incorporated herein by reference.
43
PART IV
Item 15. Exhibits, Financial Statement Schedules
Our required financial statement schedules and exhibits are filed as part of this Report as detailed in our Exhibit Index on page E-1.
(i) Financial Statements
(ii) Schedules
Other schedules have not been included because they are not required, not applicable, immaterial, or the information required has been included elsewhere herein.
(iii) Exhibits
See Exhibit Index on page E-1. We will furnish to any eligible shareholder, upon written request, a copy of any exhibit listed upon payment of a reasonable fee equal to the Company’s expenses in furnishing such exhibit. Such requests should be addressed to:
Investor Relations
Gulf Island Fabrication, Inc.
2170 Buckthorne Place, Suite 420
The Woodlands, Texas 77380
Item 16. Form 10-K Summary
None.
44
Report of Independent Registered Public Accounting Firm
To the Shareholders and the Board of Directors of Gulf Island Fabrication, Inc.
Opinion on the Financial Statements
We have audited the accompanying consolidated balance sheets of Gulf Island Fabrication, Inc. (the Company) as of December 31, 2023 and 2022, the related consolidated statements of operations, changes in shareholders' equity and cash flows for each of the two years in the period ended December 31, 2023, and the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company at December 31, 2023 and 2022, and the results of its operations and its cash flows for each of the two years in the period ended December 31, 2023, in conformity with U.S. generally accepted accounting principles.
Basis for Opinion
These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company’s financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion.
Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matter
The critical audit matter communicated below is a matter arising from the current period audit of the financial statements that was communicated or required to be communicated to the audit committee and that: (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective or complex judgments. The communication of the critical audit matter does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.
|
|
Revenue recognition for long-term contracts |
|
Description of the Matter |
|
As described in Note 1 to the consolidated financial statements, the Company recognizes revenue for long-term contracts over time using the percentage-of-completion method based on contract costs incurred to date compared to total estimated contract costs (an input method). Under this approach, the determination of the progress towards completion requires management to prepare estimates of the costs to complete the contracts. These estimates are subject to considerable judgment and could be impacted by such items as changes to the project schedule; the cost of labor, material, and subcontractors; and productivity. In addition, management must also estimate the total contract revenue the Company expects to receive for the Company’s contracts that include variable consideration, such as increases to transaction prices for approved and unapproved change orders, claims, incentives and bonuses, and reductions to transaction price for liquidated damages and penalties. Auditing management’s estimate of the progress towards completion of long-term contracts was complex and subjective because of the judgment required to evaluate management’s determination of the estimated costs to complete such contracts. Further, auditing the Company’s measurement of variable consideration was also complex and judgmental as increases to transaction prices for approved and unapproved change orders, claims, bonuses, incentives and reduction to transaction price for liquidated damages or penalties can have a material effect on the amount of revenue recognized and may require significant estimation by management regarding various possible outcomes. |
|
F-1
How We Addressed the Matter in Our Audit |
|
To test the Company’s estimated costs to complete long-term contracts, our audit procedures included, among others, evaluating the significant estimates used to develop the estimated costs to complete and testing the completeness and accuracy of the underlying data. To evaluate the significant estimates, we performed audit procedures that included, among others, comparing amounts to supporting documentation, conducting interviews with project personnel, inspecting support for estimates of project contingencies, and performing lookback analyses by comparing historical actual costs to previous estimates. To test the estimated variable consideration, we performed audit procedures that included, among others, obtaining and reviewing executed contracts including any significant amendments, change orders or claims; evaluating management’s estimates related to pending change orders, claims, liquidated damages or penalties by obtaining and recalculating management’s probability assessments; corroborating key data points to contractual language; and assessing the reasonableness of management’s assumptions by comparing to objective data points used. |
|
/s/
We have served as the Company's auditor since 1997.
F-2
GULF ISLAND FABRICATION, INC.
CONSOLIDATED BALANCE SHEETS
(in thousands)
|
|
December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
ASSETS |
|
|
|
|
|
|
||
Current assets: |
|
|
|
|
|
|
||
Cash and cash equivalents |
|
$ |
|
|
$ |
|
||
Restricted cash |
|
|
|
|
|
|
||
Short-term investments |
|
|
|
|
|
|
||
Contract receivables and retainage, net |
|
|
|
|
|
|
||
Contract assets |
|
|
|
|
|
|
||
Prepaid expenses and other assets |
|
|
|
|
|
|
||
Inventory |
|
|
|
|
|
|
||
Assets held for sale |
|
|
|
|
|
— |
|
|
Total current assets |
|
|
|
|
|
|
||
Property, plant and equipment, net |
|
|
|
|
|
|
||
Goodwill |
|
|
|
|
|
|
||
Other intangibles, net |
|
|
|
|
|
|
||
Other noncurrent assets |
|
|
|
|
|
|
||
Total assets |
|
$ |
|
|
$ |
|
||
LIABILITIES AND SHAREHOLDERS’ EQUITY |
|
|
|
|
|
|
||
Current liabilities: |
|
|
|
|
|
|
||
Accounts payable |
|
$ |
|
|
$ |
|
||
Contract liabilities |
|
|
|
|
|
|
||
Accrued expenses and other liabilities |
|
|
|
|
|
|
||
Long-term debt, current |
|
|
|
|
|
— |
|
|
Total current liabilities |
|
|
|
|
|
|
||
Long-term debt, noncurrent |
|
|
|
|
|
— |
|
|
Other noncurrent liabilities |
|
|
|
|
|
|
||
Total liabilities |
|
|
|
|
|
|
||
Shareholders’ equity: |
|
|
|
|
|
|
||
Preferred stock, par value, |
|
|
|
|
|
|
||
Common stock, par value, |
|
|
|
|
|
|
||
Additional paid-in capital |
|
|
|
|
|
|
||
Accumulated deficit |
|
|
( |
) |
|
|
( |
) |
Total shareholders’ equity |
|
|
|
|
|
|
||
Total liabilities and shareholders’ equity |
|
$ |
|
|
$ |
|
The accompanying notes are an integral part of these financial statements.
F-3
GULF ISLAND FABRICATION, INC.
CONSOLIDATED STATEMENTS OF OPERATIONS
(in thousands, except per share data)
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Revenue |
|
$ |
|
|
$ |
|
||
Cost of revenue |
|
|
|
|
|
|
||
Gross profit (loss) |
|
|
( |
) |
|
|
|
|
General and administrative expense |
|
|
|
|
|
|
||
Other (income) expense, net |
|
|
( |
) |
|
|
( |
) |
Operating loss |
|
|
( |
) |
|
|
( |
) |
Interest (expense) income, net |
|
|
|
|
|
|
||
Loss before income taxes |
|
|
( |
) |
|
|
( |
) |
Income tax (expense) benefit |
|
|
|
|
|
( |
) |
|
Net loss |
|
$ |
( |
) |
|
$ |
( |
) |
Per share data: |
|
|
|
|
|
|
||
Basic and diluted loss per share |
|
$ |
( |
) |
|
$ |
( |
) |
The accompanying notes are an integral part of these financial statements.
F-4
GULF ISLAND FABRICATION, INC.
(in thousands)
|
|
Common Stock |
|
|
Additional |
|
|
Accumulated |
|
|
Total |
|
||||||||
|
|
Shares |
|
|
Amount |
|
|
Capital |
|
|
Deficit |
|
|
Equity |
|
|||||
Balance at January 1, 2022 |
|
|
|
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
|
||||
Net loss |
|
|
— |
|
|
|
— |
|
|
|
— |
|
|
|
( |
) |
|
|
( |
) |
Vesting of restricted stock |
|
|
|
|
|
( |
) |
|
|
( |
) |
|
|
— |
|
|
|
( |
) |
|
Stock-based compensation expense |
|
|
— |
|
|
|
|
|
|
|
|
|
— |
|
|
|
|
|||
Balance at December 31, 2022 |
|
|
|
|
|
|
|
|
|
|
|
( |
) |
|
|
|
||||
Adoption of ASU 2016-13 |
|
|
— |
|
|
|
— |
|
|
|
— |
|
|
|
( |
) |
|
|
( |
) |
Balance at January 1, 2023 |
|
|
|
|
|
|
|
|
|
|
|
( |
) |
|
|
|
||||
Net loss |
|
|
— |
|
|
|
— |
|
|
|
— |
|
|
|
( |
) |
|
|
( |
) |
Vesting of restricted stock |
|
|
|
|
|
( |
) |
|
|
( |
) |
|
|
— |
|
|
|
( |
) |
|
Stock-based compensation expense |
|
|
— |
|
|
|
|
|
|
|
|
|
— |
|
|
|
|
|||
Repurchases of common stock |
|
|
( |
) |
|
|
( |
) |
|
|
( |
) |
|
|
— |
|
|
|
( |
) |
Balance at December 31, 2023 |
|
|
|
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
|
The accompanying notes are an integral part of these financial statements.
F-5
GULF ISLAND FABRICATION, INC.
CONSOLIDATED STATEMENTS OF CASH FLOWS
(in thousands)
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Cash flows from operating activities: |
|
|
|
|
|
|
||
Net loss |
|
$ |
( |
) |
|
$ |
( |
) |
Adjustments to reconcile net loss to net cash provided by (used in) operating activities: |
|
|
|
|
|
|
||
Depreciation and amortization |
|
|
|
|
|
|
||
Asset impairments |
|
|
— |
|
|
|
|
|
Change in allowance for doubtful accounts and credit losses |
|
|
( |
) |
|
|
— |
|
Loss on sale or disposal of fixed assets, net |
|
|
|
|
|
|
||
Gain on insurance recoveries |
|
|
( |
) |
|
|
( |
) |
Stock-based compensation expense |
|
|
|
|
|
|
||
Changes in operating assets and liabilities: |
|
|
|
|
|
|
||
Contract receivables and retainage, net |
|
|
( |
) |
|
|
( |
) |
Contract assets |
|
|
|
|
|
( |
) |
|
Prepaid expenses, inventory and other current assets |
|
|
( |
) |
|
|
|
|
Accounts payable |
|
|
( |
) |
|
|
( |
) |
Contract liabilities |
|
|
( |
) |
|
|
|
|
Accrued expenses and other current liabilities |
|
|
|
|
|
( |
) |
|
Noncurrent assets and liabilities, net |
|
|
|
|
|
( |
) |
|
Net cash provided by (used in) operating activities |
|
|
|
|
|
( |
) |
|
Cash flows from investing activities: |
|
|
|
|
|
|
||
Capital expenditures |
|
|
( |
) |
|
|
( |
) |
Proceeds from Shipyard Transaction |
|
|
— |
|
|
|
|
|
Proceeds from sale of property and equipment |
|
|
|
|
|
|
||
Recoveries from insurance claims |
|
|
|
|
|
|
||
Purchases of short-term investments |
|
|
( |
) |
|
|
( |
) |
Maturities of short-term investments |
|
|
|
|
|
— |
|
|
Net cash used in investing activities |
|
|
( |
) |
|
|
( |
) |
Cash flows from financing activities: |
|
|
|
|
|
|
||
Payments on Insurance Finance Arrangements |
|
|
( |
) |
|
|
( |
) |
Repurchases of common stock |
|
|
( |
) |
|
|
— |
|
Tax payments for vested stock withholdings |
|
|
( |
) |
|
|
( |
) |
Net cash used in financing activities |
|
|
( |
) |
|
|
( |
) |
Net increase (decrease) in cash, cash equivalents and restricted cash |
|
|
|
|
|
( |
) |
|
Cash, cash equivalents and restricted cash, beginning of period |
|
|
|
|
|
|
||
Cash, cash equivalents and restricted cash, end of period |
|
$ |
|
|
$ |
|
||
Supplemental cash flow information: |
|
|
|
|
|
|
||
Interest paid |
|
$ |
|
|
$ |
|
||
Income taxes paid (refunds received), net |
|
$ |
— |
|
|
$ |
— |
|
Accounts payable excluded from capital expenditures |
|
$ |
|
|
$ |
|
||
Reclassification of property, plant and equipment to assets held for sale |
|
$ |
|
|
$ |
— |
|
The accompanying notes are an integral part of these financial statements.
F-6
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
DECEMBER 31, 2023
1. ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Nature of Operations
Gulf Island Fabrication, Inc. (together with its subsidiaries, “Gulf Island,” “the Company,” “we,” “us” and “our”) is a leading fabricator of complex steel structures and modules and a provider of specialty services, including project management, hookup, commissioning, repair, maintenance, scaffolding, coatings, welding enclosures, civil construction and staffing services to the industrial and energy sectors. Our customers include U.S. and, to a lesser extent, international energy producers; refining, petrochemical, LNG, industrial and power operators; and EPC companies. We currently operate and manage our business through
In the second quarter 2021, we sold our Shipyard Division operating assets and certain construction contracts (“Shipyard Transaction”). The Shipyard Transaction excluded the contracts and related obligations for our seventy-vehicle ferry and two forty-vehicle ferry projects (collectively, “Ferry Projects”) that were under construction as of the transaction date, and excluded the contracts and related obligations for the projects that were subject to our MPSV Litigation, which was resolved on October 4, 2023. The wind down of our remaining Shipyard Division operations was substantially completed in the fourth quarter 2023. See Note 2 for further discussion of our Ferry Projects, Note 7 for further discussion of the resolution of our MPSV Litigation and Note 9 for further discussion of the wind down of our Shipyard Division operations.
Basis of Presentation
The accompanying Consolidated Financial Statements (“Financial Statements”) reflect all wholly owned subsidiaries. Intercompany balances and transactions have been eliminated in consolidation. The Financial Statements have been prepared in accordance with the rules and regulations of the U.S. Securities and Exchange Commission (the “SEC”) and accounting principles generally accepted in the U.S. (“GAAP”).
Operating Cycle
The duration of our contracts vary, but may extend beyond twelve months from the date of contract award. Consistent with industry practice, assets and liabilities have been classified as current under the operating cycle concept whereby all contract-related items are classified as current regardless of whether cash will be received or paid within a twelve-month period. Assets and liabilities classified as current, which may not be received or paid within the next twelve months, include contract retainage, contract assets and contract liabilities. Variations from normal contract terms may result in the classification of assets and liabilities as long-term.
Use of Estimates
General – The preparation of our Financial Statements in conformity with GAAP requires us to make estimates and judgments that affect the reported amounts of assets, liabilities, revenue and expenses and related disclosures of contingent assets and liabilities. We believe our most significant estimates and judgments are associated with:
F-7
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
If the underlying estimates and assumptions upon which our Financial Statements are based change in the future, actual amounts may differ materially from those included in the Financial Statements.
Oil and Gas Price Volatility and Macroeconomic Conditions – For over a decade, prices of oil and gas have experienced significant volatility, including depressed prices over extended periods, which negatively impacted our end markets and operating results. Beginning in 2020, the global coronavirus pandemic (“COVID-19”) added another layer of pressure and uncertainty on oil and gas prices (with oil prices reaching a twenty-year low and gas prices reaching a four-year low in 2020), which further negatively impacted certain of our end markets through the first quarter 2022. This volatility in oil and gas prices was compounded by Russia’s invasion of Ukraine in February 2022 (and the related European energy crisis), and the U.S. and other countries actions in response, as well as continued inflationary pressures, resulting in elevated energy prices (with oil prices reaching an eight-year high and gas prices reaching a fourteen-year high in 2022), which positively impacted certain of our end markets. While oil and gas prices declined in 2023, prices have somewhat stabilized, but the duration of such stability is uncertain and difficult to predict, particularly in light of geopolitical turmoil and uncertainty.
In addition, global economic factors that are beyond our control, have and could continue to impact our operations, including, but are not limited to, labor constraints, supply chain disruptions, inflationary pressures, economic slowdowns and recessions, natural disasters, public health crises, and geopolitical conflicts.
The ultimate business and financial impacts of oil and gas price volatility and macroeconomic conditions on our business and results of operations continues to be uncertain, but the impacts have included, or may continue to include, among other things, reduced bidding activity; suspension or termination of backlog; deterioration of customer financial condition; and unanticipated project costs and schedule delays due to supply chain disruptions, labor and material price increases, lower labor productivity, increased employee and contractor absenteeism and turnover, craft labor hiring challenges, increased safety incidents, lack of performance by subcontractors and suppliers, and contract disputes. We continue to monitor the impacts of oil and gas price volatility and macroeconomic conditions on our operations, and our estimates in future periods will be revised for any events and changes in circumstances arising after the date of this Report.
Income (Loss) Per Share
Basic income (loss) per share is calculated by dividing net income or loss by the weighted average number of common shares outstanding for the period. Diluted income (loss) per share reflects the assumed conversion of dilutive securities in periods in which income is reported. See Note 8 for calculations of our basic and diluted income (loss) per share.
Cash Equivalents and Short-term Investments
Cash Equivalents – We consider investments with original maturities of three months or less when purchased to be cash equivalents. We hold substantially all of our cash deposits with Hancock Whitney Bank (“Whitney Bank”).
Restricted Cash – At December 31, 2023 and 2022, we had $
Short-term Investments – We consider investments with original maturities of more than three months but less than twelve months to be short-term investments. At December 31, 2023 and 2022, our short-term investments included U.S. Treasuries with original maturities of approximately four to six months. We intend to hold these investments until maturity and it is not more likely than not that we will be required to sell the investments prior to their maturity. The investments are stated at amortized costs, which approximates fair value due to their near-term maturities. All short-term investments are traded on active markets with quoted prices and represent Level 1 fair value measurements.
Inventory
Inventory is recorded at the lower of cost or net realizable value determined using the first-in-first-out basis. The cost of inventory includes acquisition costs, production or conversion costs, and other costs incurred to bring the inventory to a current location and condition. Net realizable value is our estimated selling price in the normal course of business, less reasonably predictable costs of completion, disposal and transportation. An allowance for excess or inactive inventory is recorded based on an analysis that considers current inventory levels, historical usage patterns, estimates of future sales and salvage value.
F-8
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Allowance for Doubtful Accounts and Credit Losses
As further discussed under “New Accounting Standards” below, we adopted the new accounting standard for measuring credit losses effective January 1, 2023. In the normal course of business, we extend credit to our customers on a short-term basis and contract receivables are generally not collateralized; however, we typically have the right to place liens on our projects in the event of nonpayment by our customers. We provide an allowance for credit losses and routinely review individual contract receivable balances and other financial assets for collectability and make provisions for probable uncollectible amounts as necessary. Among the factors considered in our review are the financial condition of our customer and its access to financing, underlying disputes with the customer, the age and value of the receivable balance, company-specific credit ratings, historical company-specific uncollectable amounts and economic conditions in general. See Note 2 for further discussion of our allowance for doubtful accounts and credit losses.
Stock-Based Compensation
Awards under our stock-based compensation plans are calculated using a fair value-based measurement method. Depending on the terms of the award, we use the straight-line and graded vesting methods to recognize share-based compensation expense over the requisite service period of the award. We recognize the excess tax benefit or tax deficiency resulting from the difference between the deduction we receive for tax purposes and the stock-based compensation expense we recognize for financial reporting purposes created when common stock vests, as an income tax benefit or expense on our Consolidated Statement of Operations (“Statement of Operations”). Tax payments made on behalf of employees to taxing authorities in order to satisfy employee income tax withholding obligations from the vesting of shares under our stock-based compensation plans are classified as a financing activity on our Consolidated Statement of Cash Flows (“Statement of Cash Flows”). See Note 6 for further discussion of our stock-based and other compensation plans.
Assets Held for Sale
Assets held for sale are measured at the lower of their carrying amount or fair value less cost to sell. See Note 3 for further discussion of our assets held for sale.
Depreciation and Amortization Expense
Property, plant and equipment are depreciated on a straight-line basis over estimated useful lives ranging from to
Long-Lived Assets
Goodwill – Goodwill is not amortized, but instead is reviewed for impairment at least annually at a reporting unit level, absent any indicators of impairment or when other actions require an impairment assessment (such as a change in reporting units). Our Services Division represents our only reporting unit with goodwill. We perform our annual impairment assessment during the fourth quarter of each year based upon balances as of October 1. In evaluating goodwill for impairment, we have the option to first assess qualitative factors to determine whether it is more likely than not that the fair value of our reporting unit is greater than its carrying value. If we determine that it is more likely than not that the carrying value of the reporting unit is greater than its fair value, we perform a quantitative impairment test by calculating the fair value of the reporting unit and comparing it to the carrying value of the reporting unit, and we recognize an impairment charge to the extent its carrying value exceeds its fair value. To determine the fair value of our reporting unit and test for impairment, we utilize an income approach (discounted cash flow method) as we believe this is the most direct approach to incorporate the specific economic attributes and risk profile of our reporting unit into our valuation model. If, based on future assessments, our goodwill is deemed to be impaired, the impairment would result in a charge to our operating results in the period of impairment. See Note 3 for further discussion of our annual goodwill impairment assessment.
F-9
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Other Long-Lived Assets – Our property, plant and equipment, lease assets (included within other noncurrent assets) and finite-lived intangible assets are reviewed for impairment when events or changes in circumstances indicate that the carrying amount may not be recoverable. If a recoverability assessment is required, we compare the estimated future undiscounted cash flow associated with the asset or asset group to its carrying amount to determine if an impairment exists. An asset group constitutes the minimum level for which identifiable cash flows are principally independent of the cash flows of other assets or asset groups. An impairment loss is measured by comparing the fair value of the asset or asset group to its carrying amount and the excess of the carrying amount of the asset or asset group over its fair value is recorded as an impairment charge. Fair value is determined based on discounted cash flows, appraised values or third-party indications of value, as appropriate. We had no indicators of impairment during 2023. See Note 3 for discussion of our corporate office lease impairment during 2022.
Leases
We record a right-of-use asset and an offsetting lease liability on our Consolidated Balance Sheet (“Balance Sheet”) equal to the present value of our lease payments for leases with an original term of longer than twelve months. We do not record an asset or liability for leases with an original term of twelve months or less and we do not separate lease and non-lease components for our leases. Our lease assets are reflected within other noncurrent assets, and the current and noncurrent portions of our lease liabilities are reflected within accrued expenses and other liabilities, and other noncurrent liabilities, respectively, on our Balance Sheet. For leases with escalations over the life of the lease, we recognize expense on a straight-line basis. See Note 3 for further discussion of our lease assets and liabilities.
Fair Value Measurements
Fair value determinations for financial assets and liabilities are based on the particular facts and circumstances. Financial instruments are required to be categorized within a valuation hierarchy based upon the lowest level of input that is significant to the fair value measurement. The three levels of the valuation hierarchy are as follows:
The carrying amounts of our financial instruments, including cash and cash equivalents, short-term investments, accounts receivable and accounts payable approximate their fair values. Our fair value assessments for determining the impairments of inventory, assets held for sale, goodwill and long-lived assets, are non-recurring fair value measurements that fall within Level 3 of the fair value hierarchy. Our fair value assessments for long-term debt are recurring fair value measurements that fall within Level 2 of the fair value hierarchy, and are determined using various methods, including quoted prices for identical or similar securities in both active and inactive markets. See Note 3 for further discussion of our assets held for sale and Note 4 for further discussion of our long-term debt.
Revenue Recognition
General – Our revenue is derived from customer contracts and agreements that are awarded on a competitively bid and negotiated basis using a range of contracting options, including fixed-price, unit-rate, time and materials (“T&M”) and cost-reimbursable, or a combination thereof. Our contracts primarily relate to the fabrication of steel structures and modules, and certain service arrangements. We recognize revenue from our contracts in accordance with Accounting Standards Update (“ASU”) 2014-09, Topic 606 “Revenue from Contracts with Customers” (“Topic 606”).
Topic 606 requires entities to recognize revenue in a way that depicts the transfer of promised goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services. Additionally, provisions of Topic 606 specify which goods and services are distinct and represent separate performance obligations (representing the unit of account in Topic 606) within a contract and which goods and services (which could include multiple contracts or agreements) should be aggregated. In general, a performance obligation is a contractual obligation to construct and/or transfer a distinct good or service to a customer. The transaction price of a contract is allocated to each distinct performance obligation and recognized as revenue when, or as, the performance obligation is satisfied. Revenue for performance obligations satisfied over time are recognized as the work progresses. Revenue for performance obligations that do not meet the criteria for over time recognition are recognized at a point-in-time when a performance obligation is complete and a customer has obtained control of a promised asset.
F-10
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Long-term Contracts Satisfied Over Time – Revenue for our long-term contracts is recognized using the POC method based on contract costs incurred to date compared to total estimated contract costs (an input method). Fixed-price contracts, or contracts with a more significant fixed-price component, generally provide us with greater control over project schedule and the timing of when work is performed and costs are incurred, and accordingly, when revenue is recognized. Unit-rate, T&M and cost-reimbursable contracts generally have more variability in the scope of work and provide our customers with greater influence over the timing of when we perform our work, and accordingly, such contracts often result in less predictability with respect to the timing of when revenue is recognized. Contract costs include direct costs, such as materials and labor, and indirect costs attributable to contract activity. Material costs that are significant to a contract and do not reflect an accurate measure of project completion are excluded from the determination of our contract progress. Revenue for such materials is only recognized to the extent of costs incurred. Revenue and gross profit or loss for contracts accounted for using the POC method can be significantly affected by changes in estimated cost to complete such contracts. Significant estimates impacting the cost to complete a contract include: forecast costs of engineering, materials, equipment and subcontracts; forecast costs of labor and labor productivity; schedule durations, including subcontractor and supplier progress; contract disputes, including claims; achievement of contractual performance requirements; and contingency, among others. Although our customers retain the right and ability to change, modify or discontinue further work at any stage of a contract, in the event our customers discontinue work, they are required to compensate us for the work performed to date. The cumulative impact of revisions in total cost estimates during the progress of work is reflected in the period in which these changes become known, including, to the extent required, the reversal of profit recognized in prior periods and the recognition of losses expected to be incurred on contracts. Due to the various estimates inherent in our contract accounting, actual results could differ from those estimates, which could result in material changes to our Financial Statements and related disclosures. See Note 2 for further discussion of projects with significant changes in estimated margins during 2023 and 2022.
Short-term Contracts and Contracts Satisfied at a Point In Time – Revenue for our short-term contracts (which includes revenue associated with our master services arrangements) and contracts that do not satisfy the criteria for revenue recognition over time is recognized when the work is performed or when control of the asset is transferred, the related costs are incurred and collection is reasonably assured.
Variable Consideration – Revenue and gross profit or loss for contracts can be significantly affected by variable consideration, which can be in the form of unapproved change orders, claims (including amounts arising from disputes with customers), incentives and liquidated damages that may not be resolved until the later stages of the contract or after the contract has been completed. Variable consideration can also include revenue associated with work performed on a unit-rate, T&M or cost-reimbursable basis that is recognized using the POC method. We estimate variable consideration based on the amount we expect to be entitled and include estimated amounts in transaction price to the extent it is probable that a significant future reversal of cumulative revenue recognized will not occur or when we conclude that any significant uncertainty associated with the variable consideration is resolved. See Note 2 for further discussion of our unapproved change orders, claims, incentives and liquidated damages.
Additional Disclosures – Topic 606 also requires disclosures regarding the nature, amount, timing and uncertainty of revenues and cash flows from contracts with customers. See Note 2 for required disclosures under Topic 606.
Pre-Contract Costs
Pre-contract costs are generally charged to cost of revenue as incurred, but in certain cases their recognition may be deferred if specific probability criteria are met. At December 31, 2023 and 2022, we had
Other (Income) Expense, Net
Other (income) expense, net, generally represents recoveries or provisions for bad debts and credit losses, gains or losses associated with the sale or disposition of property and equipment, and income or expense associated with certain nonrecurring items. For 2023 and 2022, other (income) expense, net included gains of $
F-11
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Income Taxes
Income taxes have been provided for using the liability method. Deferred income taxes reflect the net tax effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for income tax purposes using enacted rates expected to be in effect during the year in which the differences are expected to reverse. Due to state income tax laws related to the apportionment of revenue for our projects, judgment is required to estimate the effective tax rate expected to apply to tax differences that are anticipated to reverse in the future.
A valuation allowance is provided to reserve for deferred tax assets (“DTA(s)”) if, based upon the available evidence, it is more likely than not that some or all of the DTAs will not be realized. The realization of our DTAs depends on our ability to generate sufficient taxable income of the appropriate character and in the appropriate jurisdictions. Reserves for uncertain tax positions are recognized when we consider it more likely than not that additional tax will be due in excess of amounts reflected in our income tax returns, irrespective of whether or not we have received tax assessments. Interest and penalties on uncertain tax positions are recorded within income tax expense. See Note 5 for further discussion of our income taxes and DTAs.
New Accounting Standards
Financial instruments – In the first quarter 2023, we adopted ASU 2016-13, “Financial Instruments - Credit Losses - Measurement of Credit Losses on Financial Instruments,” which changes the way we evaluate credit losses for most financial assets and certain other instruments. For trade and other receivables, short-term investments, loans and other instruments, we are required to use a new forward-looking “expected loss” model to evaluate impairment, which includes considering a broader range of information to estimate expected credit losses and may potentially result in earlier recognition of allowances for losses. The new accounting standard was adopted using the cumulative-effect transition method with any cumulative-effect adjustment being recorded to accumulated deficit on January 1, 2023. Upon adoption, we recorded a $
Business Combinations – In the first quarter 2023, we adopted ASU 2021-08, “Business Combinations - Accounting for Contract Assets and Contract Liabilities from Contracts with Customers,” which changes the way companies measure contract assets and contract liabilities from contracts with customers acquired in a business combination and creates an exception to the general recognition and measurement principle of ASC 805. Adoption of the new standard did not have a material effect on our financial position, results of operations or related disclosures.
Segment Reporting – In the fourth quarter 2023, the Financial Accounting Standards Board (“FASB”) issued ASU 2023-07 “Segment Reporting - Improvements to Reportable Segment Disclosures,” which requires additional information about a public company’s significant segment expenses and more timely and detailed segment information reporting throughout the fiscal period. The new standard will be effective for us in the fourth quarter 2024. Early adoption of the new standard is permitted; however, we have not elected to early adopt the standard. The new standard is required to be applied using the retrospective transition method. We are assessing the effect that the new standard will have on our financial statement disclosures; however, adoption will not impact our Balance Sheet or Statement of Operations.
Income Taxes – In the fourth quarter 2023, the FASB issued ASU 2023-09 “Income Taxes - Improvements to Income Tax Disclosures,” which requires enhanced disclosures related to rate reconciliation and income taxes paid information. The new standard will be effective for us in the fourth quarter 2025. Early adoption of the new standard is permitted; however, we have not elected to early adopt the standard. The new standard may be applied using either the prospective or retrospective transition method. We are assessing the effect of the new standard on our financial statement disclosures; however, adoption will not impact our Balance Sheet or Statement of Operations.
F-12
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
2. REVENUE, CONTRACT ASSETS AND LIABILITIES AND OTHER CONTRACT MATTERS
As discussed in Note 1, we recognize revenue for our contracts in accordance with Topic 606. Summarized below are required disclosures under Topic 606 and other relevant guidance.
Disaggregation of Revenue
The following tables summarize revenue for each of our operating segments, disaggregated by contract type and duration, for 2023 and 2022 (in thousands):
|
|
Year ended December 31, 2023 |
|
|||||||||||||||||
|
|
Services |
|
|
Fabrication |
|
|
Shipyard |
|
|
Eliminations |
|
|
Total |
|
|||||
Fixed-price and unit-rate |
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
( |
) |
|
$ |
|
|||
T&M and cost-reimbursable |
|
|
|
|
|
|
|
|
— |
|
|
|
— |
|
|
|
|
|||
Other |
|
|
|
|
|
— |
|
|
|
— |
|
|
|
( |
) |
|
|
|
||
Total |
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
( |
) |
|
$ |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
Long-term |
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
( |
) |
|
$ |
|
|||
Short-term |
|
|
|
|
|
|
|
|
— |
|
|
|
( |
) |
|
|
|
|||
Total |
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
( |
) |
|
$ |
|
|
|
Year ended December 31, 2022 |
|
|||||||||||||||||
|
|
Services |
|
|
Fabrication |
|
|
Shipyard |
|
|
Eliminations |
|
|
Total |
|
|||||
Fixed-price and unit-rate |
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
|
||||
T&M and cost-reimbursable |
|
|
|
|
|
|
|
|
— |
|
|
|
— |
|
|
|
|
|||
Other |
|
|
|
|
|
|
|
|
— |
|
|
|
( |
) |
|
|
|
|||
Total |
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
Long-term |
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
— |
|
|
$ |
|
||||
Short-term |
|
|
|
|
|
|
|
|
— |
|
|
|
( |
) |
|
|
|
|||
Total |
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
|
Future Performance Obligations
The following table summarizes remaining performance obligations for each of our operating segments, disaggregated by contract type, at December 31, 2023 (in thousands):
|
December 31, 2023 |
|
|||||||||||||
|
Services |
|
|
Fabrication |
|
|
Shipyard |
|
|
Total |
|
||||
Fixed-price and unit-rate |
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
||||
T&M and cost-reimbursable |
|
— |
|
|
|
|
|
|
— |
|
|
|
|
||
Total (1) |
$ |
|
|
$ |
|
|
$ |
|
|
$ |
|
F-13
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Contracts Assets and Liabilities
The timing of customer invoicing and recognition of revenue using the POC method may occur at different times. Customer invoicing is generally dependent upon contractual billing terms, which could provide for customer payments in advance of performing the work, milestone billings based on the completion of certain phases of the work, or billings when services are provided. Revenue recognized in excess of amounts billed is reflected as contract assets on our Balance Sheet, or to the extent we have an unconditional right to the consideration, is reflected as contract receivables on our Balance Sheet. Amounts billed in excess of revenue recognized, and accrued contract losses, are reflected as contract liabilities on our Balance Sheet.
|
|
December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Costs incurred to date |
|
$ |
|
|
$ |
|
||
Estimated losses incurred to date |
|
|
( |
) |
|
|
( |
) |
Sub-total |
|
|
|
|
|
|
||
Billings to date |
|
|
( |
) |
|
|
( |
) |
Total |
|
$ |
( |
) |
|
$ |
( |
) |
The above amounts are included within the following captions on our Balance Sheet at December 31, 2023 and 2022 (in thousands):
|
|
December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Contract assets (1), (2) |
|
$ |
|
|
$ |
|
||
Contract liabilities (3), (4), (5) |
|
|
( |
) |
|
|
( |
) |
Total |
|
$ |
( |
) |
|
$ |
( |
) |
Significant Customers
The following table summarizes revenue for customers that accounted for 10% or more of our consolidated revenue for 2023 and 2022 (in thousands):
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Customer A |
|
$ |
|
|
$ |
|
||
Customer B |
|
|
|
|
* |
|
||
Customer C (1) |
|
|
|
|
|
|
||
Customer D (1) |
|
|
|
|
* |
|
(*) The customer revenue was less than
F-14
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Allowance for Doubtful Accounts and Credit Losses
Our provision for bad debts and credit losses is included in other (income) expense, net on our Statement of Operations. For 2023, we recognized income of $
Variable Consideration
For 2023 and 2022, we had no material amounts in revenue related to unapproved change orders, claims or incentives, other than amounts related to the resolution of our MPSV Litigation discussed further below. However, at December 31, 2023 and 2022, certain active projects within our Shipyard Division reflected a reduction to our estimated contract price for liquidated damages of $
Changes in Project Estimates
We determine the impact of changes in estimated margins on projects for a given period by calculating the amount of revenue recognized in the period that would have been recognized in a prior period had such estimated margins been forecasted in the prior period. The total impact of changes in estimated margins for a project as disclosed on a quarterly basis may be different from the applicable year-to-date impact due to the application of the POC method and the changing progress of the project at each period end. Such impacts may also be different when a project is commenced and completed within the applicable year-to-date period but spans multiple quarters.
Changes in Estimates for 2023 – During 2023, we recorded a charge of $
As discussed in our previous quarterly filings, in connection with the delivery and commissioning of the vessel in the second quarter 2023, corrosion on the propeller blades was identified and the customer determined that replacement of the propeller blades will be required. The customer has agreed to directly procure the new propeller blades and take responsibility for future installation of the blades once received. Further, the customer agreed to bear a portion of the cost of the new propeller blades, with the remainder borne by us through the aforementioned contract price reduction.
At December 31, 2023, the project was in a loss position and the warranty period for the vessel ends in the third quarter 2024. The project would experience further losses if we incur unanticipated warranty costs on the vessel.
F-15
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
As discussed in our 2022 Financial Statements and subsequent quarterly filings, as a result of design deficiencies, we experienced rework, construction and commissioning challenges on the
At December 31, 2023, the projects were in a loss position and the warranty period for the first vessel ends in the second quarter 2024 and the warranty period for the second vessel is anticipated to end in the first quarter 2025. The projects would experience further losses if we incur unanticipated warranty costs on the vessels.
Changes in Estimates for 2022 – During 2022, significant changes in estimated margins on projects negatively impacted operating results for our Shipyard Division by $
Other Operating and Project Matters
Fabrication Division Impacts – During 2023 and 2022, we received insurance payments of $
The timing of payments from our insurance carriers often differed from when we incurred the applicable repair and cleanup costs, and accordingly, we accounted for such differences in timing as follows:
Based on the above, during 2023 and 2022, we recorded gains of $
F-16
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Shipyard Division Impacts – In addition to damage to our Houma Facilities, the storm resulted in damage to one of our forty-vehicle ferry projects, the multi-purpose supply vessels (“MPSV(s)”) and associated equipment that were previously in our possession and subject to our MPSV Litigation, and certain bulkheads where the vessels were moored. During 2023 and 2022, we recorded charges of $
3. LONG-LIVED ASSETS AND LEASED FACILITIES AND EQUIPMENT
Property, plant and equipment
Property, plant and equipment consisted of the following at December 31, 2023 and 2022 (in thousands):
|
|
Estimated |
|
December 31, |
|
|||||
|
|
Useful Life |
|
2023 |
|
|
2022 |
|
||
|
|
(in Years) |
|
|
|
|
|
|
||
Land |
|
— |
|
$ |
|
|
$ |
|
||
Buildings |
|
|
|
|
|
|
|
|||
Machinery and equipment |
|
|
|
|
|
|
|
|||
Furniture and fixtures |
|
|
|
|
|
|
|
|||
Transportation equipment |
|
|
|
|
|
|
|
|||
Improvements |
|
|
|
|
|
|
|
|||
Construction in progress |
|
— |
|
|
|
|
|
|
||
Total property, plant and equipment |
|
|
|
|
|
|
|
|
||
Accumulated depreciation |
|
|
|
|
( |
) |
|
|
( |
) |
Property, plant and equipment, net |
|
|
|
$ |
|
|
$ |
|
Depreciation expense for 2023 and 2022 was $
In February 2024, we sold certain property of our Fabrication Division that was part of our Houma Facilities for $
Leased Facilities and Equipment
|
|
Minimum |
|
|
2024 |
|
$ |
|
|
2025 |
|
|
|
|
2026 |
|
|
|
|
2027 |
|
|
|
|
Total lease payments |
|
|
|
|
Less: interest |
|
|
( |
) |
Present value of lease payments (1), (2) |
|
$ |
|
F-17
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
During 2022, we sold a purchase option for $
Goodwill and Other Intangible Assets
Goodwill – As discussed in Note 1, goodwill is not amortized, but instead is reviewed for impairment at least annually at a reporting unit level, absent indicators of impairment or when other actions require an impairment assessment (such as a change in reporting units). We perform our annual impairment assessment during the fourth quarter of each year based on balances as of October 1. At October 1, 2023, our Services Division represented our only reporting unit. During 2023, we had
Other Intangible Assets –
|
|
December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Customer relationships |
|
$ |
|
|
$ |
|
||
Accumulated amortization |
|
|
( |
) |
|
|
( |
) |
Intangible assets, net |
|
$ |
|
|
$ |
|
Our intangible assets have estimated lives of
4. CREDIT FACILITIES AND DEBT
LC Facility
On May 5, 2023, we amended our LC Facility with Whitney Bank to reduce our letters of credit capacity from $
Surety Bonds
We issue surety bonds in the ordinary course of business to support our projects. At December 31, 2023, we had $
F-18
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Note Agreement
In connection with the resolution of our MPSV Litigation and the Settlement Agreement, on November 6, 2023, we entered into a promissory note (“Note Agreement”) with one of our Sureties (Fidelity & Deposit Company of Maryland (“FDC”) and Zurich American Insurance Company (together with FDC, “Zurich”)), pursuant to which we will pay Zurich $
|
|
Principal |
|
|
2024 |
|
$ |
|
|
2025 |
|
|
|
|
2026 |
|
|
|
|
2027 |
|
|
|
|
2028 |
|
|
|
|
Thereafter |
|
|
|
|
Total maturities (1), (2) |
|
$ |
|
See Note 7 for further discussion of the resolution of our MPSV Litigation and the Settlement Agreement.
Mortgage Agreement and Restrictive Covenant Agreement
In connection with the receipt of a consent for the Shipyard Transaction from Zurich, we entered into a multiple indebtedness mortgage (“Mortgage Agreement”) and a restrictive covenant arrangement (“Restrictive Covenant Agreement”) with Zurich to secure our obligations for our MPSV projects and forty-vehicle ferry projects. The Mortgage Agreement encumbers all real estate associated with the Houma Facilities and includes certain covenants and events of default. In connection with the resolution of our MPSV Litigation and Note Agreement entered into with Zurich, the Mortgage Agreement was modified on November 6, 2023, to include a provision requiring that
Insurance Finance Arrangements
In connection with the renewal of our property and equipment insurance coverages during 2022, and general liability insurance coverages during 2023, we entered into short-term premium finance arrangements (“Insurance Finance Arrangements”). The property and equipment arrangement totaled $
F-19
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
5. INCOME TAXES
Income Tax (Expense) Benefit
A reconciliation of the U.S. federal statutory tax rate to our income tax (expense) benefit for 2023 and 2022, is as follows (in thousands):
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
U.S. statutory rate |
|
|
% |
|
|
% |
||
Increase (decrease) resulting from: |
|
|
|
|
|
|
||
Permanent differences |
|
|
( |
)% |
|
|
( |
)% |
State income taxes |
|
|
( |
)% |
|
|
% |
|
Discrete items |
|
|
|
|
|
|
||
Vesting of common stock |
|
|
( |
)% |
|
|
( |
)% |
Change in valuation allowance |
|
|
( |
)% |
|
|
( |
)% |
Return to provision and other |
|
|
% |
|
|
% |
||
Income tax (expense) benefit |
|
|
% |
|
|
( |
)% |
Significant components of our income tax (expense) benefit for 2023 and 2022, were as follows (in thousands):
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Current |
|
|
|
|
|
|
||
Federal |
|
$ |
|
|
$ |
|
||
State |
|
|
|
|
|
|
||
Total current |
|
|
|
|
|
|
||
Deferred |
|
|
|
|
|
|
||
Federal |
|
|
|
|
|
|
||
State |
|
|
( |
) |
|
|
|
|
Valuation allowance |
|
|
( |
) |
|
|
( |
) |
Total deferred |
|
|
|
|
|
( |
) |
|
Income tax (expense) benefit |
|
$ |
|
|
$ |
( |
) |
Deferred Taxes
Significant components of our deferred tax assets and liabilities at December 31, 2023 and 2022, were as follows (in thousands):
|
|
December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Deferred tax assets |
|
|
|
|
|
|
||
Leases |
|
$ |
|
|
$ |
|
||
Employee benefits |
|
|
|
|
|
|
||
Accrued losses on uncompleted contracts |
|
|
|
|
|
|
||
Stock based compensation expense |
|
|
|
|
|
|
||
Debt interest |
|
|
|
|
|
- |
|
|
Federal net operating losses |
|
|
|
|
|
|
||
State net operating losses |
|
|
|
|
|
|
||
R&D and other tax credits |
|
|
|
|
|
|
||
Other |
|
|
|
|
|
|
||
Total deferred tax assets |
|
|
|
|
|
|
||
Deferred tax liabilities |
|
|
|
|
|
|
||
Depreciation |
|
|
( |
) |
|
|
( |
) |
Prepaid insurance |
|
|
( |
) |
|
|
( |
) |
Total deferred tax liabilities |
|
|
( |
) |
|
|
( |
) |
Net deferred tax assets |
|
|
|
|
|
|
||
Valuation allowance |
|
|
( |
) |
|
|
( |
) |
Net deferred taxes (1) |
|
$ |
( |
) |
|
$ |
( |
) |
F-20
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
At December 31, 2023 and 2022, we had total DTAs of $
At December 31, 2023, we had gross U.S. federal NOL carryforwards (excluding VAs) of $
Uncertain Tax Positions
Reserves for uncertain tax positions are recognized when we consider it more likely than not that additional tax will be due in excess of amounts reflected in our income tax returns, irrespective of whether or not we have received tax assessments. Interest and penalties on uncertain tax positions are recorded within income tax expense. At December 31, 2023 and 2022, we had no material reserves for uncertain tax positions. Tax returns subject to examination by the U.S. Internal Revenue Service are open for years after 2019.
6. RETIREMENT AND LONG-TERM INCENTIVE PLANS
Defined Contribution Plan
We sponsor a defined contribution plan for eligible employees that is qualified under Section 401(k) of the Internal Revenue Code, which includes voluntary employee pre-tax contributions and Company-matching contributions, with potential additional discretionary contributions determined by our Board of Directors (“Board”). During 2023 and 2022, we contributed $
Long-Term Incentive Plans
Under our long-term incentive plans (“Incentive Plans”), the Compensation Committee of our Board may grant cash-based and equity-based awards to eligible employees and non-employee directors, including restricted stock unit (“RSU”) awards (both time-based and performance-based), stock option awards and cash-based performance awards. The Compensation Committee determines the amount of each award, as well as the terms, conditions, performance measures and other provisions of the award. Under our Incentive Plans, the maximum number of shares that may be granted to any one officer or employee during any single calendar year is
F-21
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
RSU Awards – An RSU represents the right to receive one share of our common stock upon vesting, or the equivalent cash value on the vesting date if the award is cash-settled. RSUs are subject to transfer restrictions, forfeiture provisions and other terms and conditions of the Incentive Plans and applicable award agreements. Forfeitures are recognized as they occur.
A summary of activity for our RSU awards (excluding Cash-Settled RSUs) for 2023 and 2022 is as follows:
|
|
2023 |
|
|
2022 |
|
||||||||||
|
|
Number |
|
|
Weighted- |
|
|
Number |
|
|
Weighted- |
|
||||
RSUs, beginning of period |
|
|
|
|
$ |
|
|
|
|
|
$ |
|
||||
Granted |
|
|
|
|
|
|
|
|
|
|
|
|
||||
Vested |
|
|
( |
) |
|
|
|
|
|
( |
) |
|
|
|
||
Forfeited |
|
|
— |
|
|
|
— |
|
|
|
( |
) |
|
|
|
|
RSUs, end of period |
|
|
|
|
|
|
|
|
|
|
|
|
Compensation expense for our RSU awards was $
Stock Option Awards and Cash-based Performance Awards – At December 31, 2023, we had
F-22
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
7. COMMITMENTS AND CONTINGENCIES
Routine Legal Proceedings
We are subject to various routine legal proceedings in the normal conduct of our business, primarily involving commercial disputes and claims, workers’ compensation claims, and claims for personal injury under general maritime laws of the U.S. and the Jones Act. While the outcome of these legal proceedings cannot be predicted with certainty, we believe that the outcome of any such proceedings, even if determined adversely, would not have a material adverse effect on our financial position, results of operations or liquidity.
Resolution of MPSV Litigation
On March 19, 2018, our subsidiary, Gulf Island Shipyards, LLC (“GIS”), received termination notices from its customer, Hornbeck Offshore Services, LLC (“Hornbeck”), of the contracts for the construction of
On October 4, 2023, the MPSV Litigation was dismissed in full with prejudice at the request of the parties after the parties reached an agreement in principle. In addition, on November 6, 2023, GIS and the Company entered into an agreement (“Settlement Agreement”) with Zurich pursuant to which Zurich released GIS and the Company from all of their obligations under the Performance Bonds and the associated general indemnity agreements relating to the Performance Bonds, and we agreed to release possession of the MPSVs to Zurich, which occurred in the fourth quarter 2023. Further, we entered into the Note Agreement. See Note 4 for further discussion of the Note Agreement.
As a result of the resolution of the MPSV Litigation, during the third quarter 2023, we recorded a charge of $
Insurance
We maintain insurance coverage for various aspects of our business and operations. However, we may be exposed to future losses due to coverage limitations and our use of deductibles and self-insured retentions for our exposures related to property and equipment damage, builder’s risk, third-party liability and workers’ compensation and USL&H claims. In connection with our insurance coverage renewal for our property and equipment during 2023, we determined that the benefits of maintaining insurance coverage for our property and equipment were limited due to high premium costs and deductibles and increased coverage limitations. Accordingly, we did not renew all of our property and equipment coverage and are now generally self-insured for exposures resulting from any future damage to our property and equipment.
To the extent we have insurance coverage, we do not have an offset right for liabilities in excess of any deductibles and self-insured retentions. Accordingly, we have recorded a liability for estimated amounts in excess of our deductibles and retentions, and have recorded a corresponding asset related to estimated insurance recoveries, on our Balance Sheet. Further, to the extent we are self-insured, reserves are recorded based upon our estimates, with input from legal and insurance advisors. Changes in assumptions, as well as changes in actual experience, could cause these estimates to change. See Note 2 for discussion of the costs incurred associated with damage caused by Hurricanes Ida.
F-23
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Letters of Credit and Surety Bonds
We obtain letters of credit under our LC Facility or surety bonds from financial institutions to provide to our customers in order to secure advance payments or guarantee performance under our contracts, or in lieu of retention being withheld on our contracts. Letters of credit under our LC Facility are subject to cash securitization of the full amount of the outstanding letters of credit. In the event of non-performance under a contract, our cash securitization with respect to the letter of credit supporting such contract would become the property of Whitney Bank. With respect to surety bonds, payments by a Surety pursuant to a bond in the event of non-performance are subject to reimbursement to such Surety by us under a general indemnity agreement relating to such bond. Such indemnification obligations may include the face amount of the surety bond, or portions thereof, as well as other reimbursable items such as interest and certain investigative expenses and legal fees of the Surety. Such indemnification obligations would require us to use our cash, cash equivalents or short-term investments, and we may not have sufficient liquidity to satisfy such indemnification obligations. When a contract is complete, the contingent obligation terminates, and letters of credit or surety bonds are returned. See Note 4 for further discussion of our LC Facility and surety bonds.
Environmental Matters
Our operations are subject to extensive and changing U.S. federal, state and local laws and regulations, as well as the laws of other countries, that establish health and environmental quality standards. These standards, among others, relate to air and water pollutants and the management and disposal of hazardous substances and wastes. We are exposed to potential liability for personal injury or property damage caused by any release, spill, exposure or other accident involving such pollutants, substances or wastes. In connection with the historical operation of our facilities, including those associated with acquired operations, substances which currently are or might be considered hazardous were used or disposed of at some sites that will or may require us to make expenditures for remediation. We believe we are in compliance, in all material respects, with environmental laws and regulations and maintain insurance coverage to mitigate exposure to environmental liabilities. We do not believe any environmental matters will have a material adverse effect on our financial condition, results of operations or cash flow.
Leases
We maintain operating leases for our corporate office and certain operating facilities and equipment. See Note 3 for further discussion of our leases.
8. INCOME (LOSS) PER SHARE AND SHAREHOLDERS’ EQUITY
Income (Loss) Per Share
The following table presents the computation of basic and diluted loss per share for 2023 and 2022 (in thousands, except per share data):
|
|
Years Ended December 31, |
|
|||||
|
|
2023 |
|
|
2022 |
|
||
Net loss |
|
$ |
( |
) |
|
$ |
( |
) |
Weighted average shares |
|
|
|
|
|
|
||
Basic and diluted loss per share |
|
$ |
( |
) |
|
$ |
( |
) |
Shareholders’ Equity
On December 1, 2023, our Board approved a share repurchase program (“Share Repurchase Program”) authorizing the repurchase of up to $
F-24
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
9. OPERATING SEGMENTS
We currently operate and manage our business through
Services Division – Our Services Division provides maintenance, repair, construction, scaffolding, coatings, welding enclosures and other specialty services on offshore platforms and inland structures and at industrial facilities; provides services required to connect production equipment and service modules and equipment on offshore platforms; provides project management and commissioning services; provides industrial staffing services; and performs municipal and drainage projects, including pump stations, levee reinforcement, bulkheads and other public works. Our services activities are managed from our various Facilities.
Fabrication Division – Our Fabrication Division fabricates modules, skids and piping systems for onshore refining, petrochemical, LNG and industrial facilities and offshore facilities; fabricates foundations, secondary steel components and support structures for alternative energy developments and coastal mooring facilities; fabricates offshore production platforms and associated structures, including jacket foundations, piles and topsides for fixed production and utility platforms, as well as hulls and topsides for floating production and utility platforms; and fabricates other complex steel structures and components. Our fabrication activities are performed at our Houma Facilities.
Shipyard Division – Our Shipyard Division previously fabricated newbuild marine vessels and provided marine repair and maintenance services. However, in the second quarter 2021, we completed the Shipyard Transaction. The Shipyard Transaction excluded the contracts and related obligations for our Ferry Projects that were under construction as of the transaction date, and excluded the contracts and related obligations for the projects that were subject to our MPSV Litigation, which was resolved on October 4, 2023. Construction of the Ferry Projects was performed at our Houma Facilities and the wind down of our remaining Shipyard Division operations was substantially completed in the fourth quarter 2023. Final completion of the wind down will occur upon completion of the warranty periods for the Ferry Projects, the last of which is anticipated to occur in the first quarter 2025. At December 31, 2023 and 2022, the net operating liabilities on our Balance Sheet associated with our Shipyard Division operations totaled $
Corporate Division and Allocations – Our Corporate Division includes costs that do not directly relate to our operating divisions. Such costs include, but are not limited to, costs of maintaining our corporate office, executive management salaries and incentives, board of directors’ fees, certain insurance costs and costs associated with overall corporate governance and reporting requirements for a publicly traded company. Shared resources and costs that benefit more than one operating division are allocated amongst the operating divisions based on each operating division’s estimated share of the benefit received. Such costs include, but are not limited to, human resources, insurance, information technology, accounting, business development and certain division leadership.
F-25
GULF ISLAND FABRICATION, INC.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS-(Continued)
Segment Results – We generally evaluate the performance of, and allocate resources to, our divisions based upon gross profit or loss and operating income or loss. Segment assets are comprised of all assets attributable to each division. Intersegment revenues are priced at the estimated fair value of work performed.
|
|
Year Ended December 31, 2023 |
|
|||||||||||||||||
|
|
Services |
|
|
Fabrication |
|
|
Shipyard |
|
|
Corporate |
|
|
Total |
|
|||||
Revenue (eliminations) (1) |
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
( |
) |
|
$ |
|
|||
Gross profit (loss) (1) |
|
|
|
|
|
|
|
|
( |
) |
|
|
— |
|
|
|
( |
) |
||
Operating income (loss) (1) |
|
|
|
|
|
|
|
|
( |
) |
|
|
( |
) |
|
|
( |
) |
||
Depreciation and amortization expense |
|
|
|
|
|
|
|
|
— |
|
|
|
|
|
|
|
||||
Capital expenditures |
|
|
|
|
|
|
|
|
— |
|
|
|
|
|
|
|
||||
Total assets (3) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year Ended December 31, 2022 |
|
|||||||||||||||||
|
|
Services |
|
|
Fabrication |
|
|
Shipyard |
|
|
Corporate |
|
|
Total |
|
|||||
Revenue (eliminations) |
|
$ |
|
|
$ |
|
|
$ |
|
|
$ |
( |
) |
|
$ |
|
||||
Gross profit (loss) (2) |
|
|
|
|
|
( |
) |
|
|
( |
) |
|
|
— |
|
|
|
|
||
Operating income (loss) (2) |
|
|
|
|
|
|
|
|
( |
) |
|
|
( |
) |
|
|
( |
) |
||
Depreciation and amortization expense |
|
|
|
|
|
|
|
|
— |
|
|
|
|
|
|
|
||||
Capital expenditures |
|
|
|
|
|
|
|
|
— |
|
|
|
|
|
|
|
||||
Total assets (3) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10. SUBSEQUENT EVENTS
In February 2024, we sold our Houma AHFS for $
F-26
GULF ISLAND FABRICATION, INC.
EXHIBIT INDEX
EXHIBIT |
|
|
3.1 |
|
|
3.2 |
|
|
4.1 |
|
|
4.2 |
|
|
10.1 |
|
|
10.2 |
|
|
10.3 |
|
|
10.4 |
|
|
10.5 |
|
|
10.6 |
|
|
10.7 |
|
|
10.8 |
|
|
10.9 |
|
|
10.10 |
|
E-1
EXHIBIT |
|
|
10.11 |
|
|
10.12 |
|
|
10.13 |
|
|
21 |
|
Subsidiaries of the Company - The Company’s significant subsidiaries, Gulf Island Works, L.L.C., Gulf Island, L.L.C., Gulf Island Shipyards, L.L.C. (with trade name Gulf Island Marine Fabricators), Gulf Island Services, L.L.C. (with trade names Gulf Island Steel Sales, Dolphin Services and Dolphin Steel Sales) (each organized under Louisiana law) and Gulf Marine Fabricators, L.P. (a Texas limited partnership) are wholly owned and are included in the Company's consolidated financial statements. |
22 |
|
Subsidiary guarantors and issuers of guaranteed securities – From time to time, the Company may issue debt securities under a registration statement on Form S-3 filed with the SEC that are fully and unconditionally guaranteed by Gulf Island, L.L.C. and Gulf Island Services, L.L.C., each a wholly-owned subsidiary of the Company. |
23.1 |
|
|
31.1 |
|
CEO Certifications pursuant to Rule 13a-14 under the Securities Exchange Act of 1934.* |
31.2 |
|
CFO Certifications pursuant to Rule 13a-14 under the Securities Exchange Act of 1934.* |
32 |
|
Section 906 Certifications furnished pursuant to 18 U.S.C. Section 1350.* |
97.1 |
|
|
101 INS |
|
Inline XBRL Instance Document – the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document. |
101.SCH |
|
Inline XBRL Taxonomy Extension Schema With Embedded Linkbase Documents. |
104 |
|
The cover page for the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2023, has been formatted in Inline XBRL and is contained in Exhibit 101. |
Management Contract or Compensatory Plan.
* Filed herewith.
^ SEC File Number 000-22303.
E-2
SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized, on March 7, 2024.
GULF ISLAND FABRICATION, INC. (Registrant) |
|
|
|
By: |
/S/ RICHARD W. HEO |
|
Richard W. Heo |
|
President and Chief Executive Officer |
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on March 7, 2024.
Signature |
|
Title |
|
|
|
/S/ RICHARD W. HEO |
|
President, Chief Executive Officer and Director (Principal Executive Officer) |
Richard W. Heo |
|
|
|
|
|
/S/ WESTLEY S. STOCKTON |
|
Executive Vice President, Chief Financial Officer, Treasurer and Secretary (Principal Financial Officer and Principal Accounting Officer) |
Westley S. Stockton |
|
|
|
|
|
/S/ ROBERT M. AVERICK |
|
Director |
Robert M. Averick |
|
|
|
|
|
/S/ WILLIAM E. CHILES |
|
Chairman of the Board |
William E. Chiles |
|
|
|
|
|
/S/ MICHAEL J. KEEFFE |
|
Director |
Michael J. Keeffe |
|
|
|
|
|
/S/ CHERYL D. RICHARD |
|
Director |
Cheryl D. Richard |
|
|
|
|
|
/S/ JAY R. TROGER |
|
Director |
Jay R. Troger |
|
|
S-1